2009-12-21_REVISION - M1980244 (40)
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App.A, Phase IVc Cert. Doc.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -2- 043 -2170 <br />quantities and testing frequencies ;presented in this report are current as of October 2004, which <br />represents completion of the Phase IVc OSA, as detailed in this report. <br />1.2 Construction Quality Assurance/Quality Control <br />Golder provided CQA and CQC monitoring and testing services, and prepared this report describing <br />the monitoring and test results for the Phase We OSA activities. As -built drawings and supporting <br />CQA and CQC monitoring and testing documentation are presented in appendices attached to this <br />report. <br />1.2.1 CQA Monitoring of Earthworks <br />Golder provided CQC testing and CQA testing and monitoring of earthworks for the Phase IVc OSA. <br />CQA testing and monitoring of earthworks was provided for in -place materials in accordance with the <br />Golder Earthworks CQA Plan. The earthworks material specifications for this project are <br />summarized in Table 1. CQC earthworks testing was provided to support the contractor during the <br />manufacture of materials and prior to material placement. The CQC test results are not included in <br />this report because these tests were intended to assist the contractor in materials preparation rather <br />than record testing. <br />Golder provided CQA laboratory and field testing, and monitored earthworks construction activities <br />as follows: <br />• Golder visually monitored and documented the remediation of underground <br />workings within the Phase IVc OSA footprint, including verification that Ames <br />excavated underground workings to the minimum specified dimensions and then <br />installed Coarse Shaft Backfill (CSB), Concrete Plug (CP), Cemented Rockfill <br />(CR), Select Structural Fill (SSF), Structural Fill (SF), and geogrid as specified on <br />the Issued For Construction (IFC) drawings. <br />• Golder monitored construction of the Secondary Underdrain (SID, including <br />verification that Ames excavated trenches to minimum required dimensions and <br />grades, and placed materials as specified. Golder performed CQA laboratory testing <br />of grain size, Atterberg limits, and moisture content of the Underdrain Fill (UF) and <br />SSF placed in the Underdrains. <br />• Golder monitored and observed construction of the permanent storm water <br />diversion channel outside the perimeter of the Phase IVc OSA, which includes <br />verification of properly excavated diversion channel dimensions, removal of <br />L9W12170�AIOOICdfQAPhNofOanw ]2t70.0.10d12�81CenPoNadac Golder Associates <br />