My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App.A, Phase IVc Cert. Doc.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -4- 043 -2170 <br />certifications prior to geosynthetics deployment. Golder performed geosynthetics CQA activities in <br />accordance with the CQA Plan. Geosynthetics CQA activities performed included: <br />• Observation and documentation of geomembrane deployment, trial seams, seaming, <br />destructive testing, and non - destructive testing (pressure tests and vacuum tests); <br />• Performing conformance testing of geomembrane; <br />• Measuring ,comembrane panel thickness and confirming adequate panel overlap; <br />• Visually inspecting geomembrane sheet quality, sheet grinding, seam alignment, <br />and continuity; <br />Retaining archive samples of geomembrane destructive tests and trial seams; and <br />• Observation and documentation of geogrid deployment for remediation of <br />underground workings. <br />1.3 Project Coordination <br />Golder CQC and CQA activities were directed by Golder. The Golder Resident Engineer for the <br />period September 2001 to December 2002 was Mr. Bob Nichols, and the Golder Project Resident for <br />the remainder of Phase IVe construction was Mr. Ron DiDonato. The Certifying Engineer, <br />Mr. John F. Lupo, Ph.D., P.E. or his representatives (Ms. Kimberly Finke Morrison, P.E., R.G., <br />Senior Project Engineer, and Mr. James M. Johnson, P.E., Principal) made periodic site visits to <br />resolve technical issues and to review Golder activities. Golder staffing from the period of September <br />2001 through August 2002 are presented in the October 2002 Phase IVa Certification Report, staffing <br />from the period of September 2002 through June 2003 are presented in the June 2003 Phase IVb <br />PSSA Certification Report, and staffing from the period of June 2003 through October 2003 are <br />presented in the October 2003 Phase IVb OSA Certification Report. Appendix C presents a summary <br />of the Golder staff on -site during the period of April 2004 through October 2004. <br />Representatives of CC &V, Ames, Poly -Flex, and Golder conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Reports <br />Golder prepared daily construction summary reports as well as photographic documentation <br />(Appendix B) throughout the proiect to document the key elements of construction and the CQA <br />t:W4%2l? 4=Cen- QAMLV.ioo"4nlre.04KI &Cu&t,rV.a« Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.