My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App.A, Phase IVc Cert. Doc.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -5- 043 -2170 <br />activities that occurred. On -site Golder CQA personnel, the Certifying Engineer and the Project <br />Engineer discussed construction activities on a regular basis. In addition, field personnel prepared <br />daily observation reports. Golder submitted these daily reports and a daily summary report to CC &V. <br />Daily reports are not included in this report but were available for Colorado Division of Minerals and <br />Geology (DMG) review during the course of the project. <br />1.3.2 Weeklv Construction Summary Reports <br />Golder prepared weekly construction summary reports, which were submitted to CC &V and to the <br />DMG. Weekly reports for the period of September 2001 through August 2002 are presented in the <br />October 2002 Phase 1Va Certification Report, weekly reports from the period of September 2002 <br />through June 2003 are presented in the June 2003 Phase IVb PSSA Certification Report, and weekly <br />reports during the period of June 2003 through October 2003 are presented in the October 2003 <br />Phase IVb OSA Certification Report. The weekly reports during the period of April 2004 through <br />October 2004 are presented in Appendix D. <br />1.4 Project Specifications <br />Is <br />All work was performed in accordance with the design plans and specifications in Amendment No. 8 <br />to Mining Permit M- 1980 -244 and subsequent revisions as approved by DMG. Issued for <br />Construction (fFC) drawings are presented in the Drawings section of this report and project <br />specifications are presented in Appendix E. No specification changes were documented during the <br />Phase We 2004 construction season. <br />1.5 Record Survey Documentation <br />Ames Construction of Aurora, Colorado provided the Record Drawings for the activities associated <br />with the Phase IVc OSA, A Colorado Registered Land Surveyor prepared the drawings. The Record <br />Drawings are presented in Appendix A. The Surveyor's certificates are presented in Appendix F. <br />Ames also provided locations for SLF density tests, SLF depth checks, geomembrane panel <br />intersections, and destructive tests, which were used by Golder to develop the test summaries and the <br />as -built geomembrane panel layout drawing. <br />rwn: �raa+ wua4newv�aoaw�3i :awoa��asc..�eerv�aa Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.