Laserfiche WebLink
• <br />October 2004 -6- <br />1.6 Certification Boundary <br />Items addressed in the Phase IVe OSA Certification Report include the following: <br />043 -2170 <br />• Underground workings remediation; underdrain construction; leak detection trench <br />construction; site grading; SF and subgrade preparation; SLF installation, placement <br />and compaction; 80 -mil geomembrane installation; installation of HVSCS piping; <br />DCF placement; and <br />• Construction of the permanent diversion channel upgradient of Station 7 +00. <br />Ll <br />0 <br />The certified limits of the Phase We OSA are shown in Figure 2. <br />]:a % 2170* !M.ft- WbTVc- IWI%UnIoaMI2485c nesavoa- Golder Associates <br />