Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Liner Recertification <br />December 17, 2009 <br />or exceeded project specifications. The geomembrane roll CQC certificates are presented in <br />Appendix H -4. <br />5.2.3 Welding Rod CQC Certificates <br />Welding rod certification consisted of resin CQC documents for the resin used to manufacture <br />the welding material for the Cresson Project. The welding material used on this project was <br />produced from 3 batches of resin. AMEC's review of the CQC certification indicates that the <br />resin used to manufacture the welding material met project specifications. The welding rod <br />CQC certificates are presented in Appendix H -5. <br />• <br />S: \PROJECTS \7125E CCV CQA \H2 - DESIGN\LINER RECERTIFICATION REPORT\REPORT BODY\QA MONTIORING AND TEST RESULTS LINER 15 <br />RECERTIFICATION.DOG <br />