My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/30/2009 8:52:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recertification, Monitoring and Test results,
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project ��� <br />Quality Assurance Monitoring and Test Results <br />Liner Recertification <br />December 17, 2009 <br />5.0 GEOSYNTHETICS CQC SUBMITTALS <br />Geosynthetics CQC submittals reviewed by AMEC included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, and welding rod certificates. <br />AMEC's inventory control, summarizing CQC certification received for each roll of <br />geomembrane received, is presented in Appendix H. All geosynthetic material used met project <br />specifications. <br />5.1 Geomembrane Installation Personnel Resumes <br />AMEC reviewed the resumes of Lonestar installation personnel to verify that the installation <br />superintendent and the seaming personnel possessed sufficient experience as required by the <br />project specifications. Review of the installation personnel resumes indicated that key <br />personnel had experience sufficient to meet or exceed project specifications. Geomembrane <br />personnel resumes are presented in Appendix H -2. <br />5.2 Geomembrane CQC Documents <br />CQC documents submitted by Poly -Flex included resin supplier certificates and geomembrane <br />manufacturer resin certificates, geomembrane roll certificates, and welding rod certificates. <br />AMEC reviewed CQC documents prior to geomembrane placement and verified that the <br />documentation was complete and that the material properties and CQC testing frequency <br />required by specifications were met. <br />5.2.1 Resin COC Certificates <br />LLDPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br />Chevron Phillips Chemical Company, at a frequency of one per rail car shipment. AMEC <br />reviewed these certificates prior to geomembrane placement. The geomembrane manufacturer <br />also performed density and melt index tests of the resin supplied by Chevron Phillips Chemical <br />Company to verify material properties prior to geomembrane manufacture. The CQC <br />certificates provided by the resin manufacturer are presented in Appendix H -3. <br />5.2.2 Roll COC Certificates <br />Poly -Flex provided CQC certificates for each roll (approximately every 6900 ft of LLDPE <br />geomembrane used for the project, exceeding the required minimum frequency of one per <br />50,000 square feet of geomembrane. AMEC reviewed the CQC certificates to verify <br />conformance of the geomembrane to the project requirements. Geomembrane was placed only <br />when complete CQC documentation was provided and AMEC determined that test results met <br />w <br />S: \PROJECTS \7125E CCV CQA \H2 - DESIGN\LINER RECERTIFICATION REPORT\REPORT BODY\QA MONTIORING AND TEST RESULTS LINER 14 <br />RECERTIFICATION.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.