My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/30/2009 8:52:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recertification, Monitoring and Test results,
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project ��� <br />Quality Assurance Monitoring and Test Results <br />Liner Recertification <br />December 17, 2009 <br />6.0 GEOSYNTHETIC CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by AMEC for the geomembrane <br />installed in the re- certified areas. <br />In accordance with the AMEC CQA Plan, when an AMEC monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Lonestar and /or CC &V. <br />When unsatisfactory test results identified a deficiency, AMEC performed additional tests to <br />define the extent of the deficient area. Lonestar corrected deficiencies to meet the requirements <br />of the specifications, and AMEC retested and /or approved the corrected deficiency prior to any <br />additional related work. The following sections include discussions of the deficiencies <br />encountered. <br />6.1 Geomembrane <br />CQA activities conducted by AMEC during the installation of the LLDPE geomembrane <br />consisted of the following: <br />• Conformance sampling and testing of the geomembrane; <br />• Observation and approval of the SLF surface prior to deployment of geomembrane; <br />• Observation and documentation of geomembrane deployment, including verifying sheet <br />thickness and overlap and documenting panel layout; <br />• Observation of trial seam sample testing and documentation of results; <br />■ Observation and documentation of field seaming; <br />■ Identification of destructive seam sample test locations, observation of destructive seam <br />sample testing, and documentation of test results; <br />■ Observation and documentation of geomembrane repairs; and, <br />■ Observation and documentation of non - destructive pressure testing of fusion seams and <br />vacuum testing of extrusion seams and repairs. <br />The following sections present a detailed description of each of the above activities. <br />El <br />S: \PROJECTS \1125E CCV CQA \H2 - DESIGN\LINER RECERTIFICATION REPORT\REPORT BODY\OA MONTIORING AND TEST RESULTS LINER <br />RECERTIFICATION.DOC <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.