My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_PERMIT FILE - C1992080A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080A
>
2008-08-11_PERMIT FILE - C1992080A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:22 PM
Creation date
12/29/2009 8:44:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
8/11/2008
Doc Name
Revised Permit Document
Section_Exhibit Name
Abridged Permit Document
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Moved the recovered spoiled fill material to the base of the bench adjacent to the sandstone at <br />the inside edge of the bench using the tracked excavator. <br />3) Moved boulders and cobble material from the bench area to the inside edge of the bench prior <br />to backfilling. This was undertaken with a bulldozer and tracked excavator. <br />4) Loaded and hauled needed fill from the Permanently Reclaimed Spoils Area below the North <br />Pit. Backfilling left a 30 foot wide bench with the North Pit backfilled against the sandstone <br />scarp to a grade of 3H:1 V (see Cross - Section Map). This task was accomplished with tracked <br />excavator and articulated dump truck team. <br />5) Regraded the North Pit bench fill to final contour with a bulldozer and motorgrader. <br />6) Loaded and hauled topsoil from Topsoil Stockpile 92, covering the entire North Pit bench fill <br />area and downslope area with eight to twelve inches of topsoil. <br />7) Regraded and spread the topsoil. <br />8) Seeded and mulched the North Pit area as described in the revegetation plan. <br />North Pit Haul Road Reclamation <br />The North Pit Haul Road provided access to the North Pit during the operation of the Carbon <br />Junction Mine. Pre - reclamation disturbance consisted of the 40 -60 foot roadway and outslope <br />material. <br />Reclamation of the North Pit involved the following tasks undertaken between May and August <br />2006: <br />1) Loaded and hauled needed fill from the Permanently Reclaimed Spoils Area. Backfilling left <br />a 30 foot wide road surface with roadside slopes backfilled to a grade of 3H: IV (see Cross - <br />Section Map). This task was accomplished with tracked excavator and articulated dump truck <br />team. <br />2) Regraded and finish graded the sideslopes, outslopes, and road surface. <br />3) Loaded and hauled topsoil from Topsoil Stockpile #2, covering the entire North Pit Haul Road <br />sideslopes and downslope areas with eight to twelve inches of topsoil. <br />4) Placed large sandstone donnikers on the roadside slopes for wildlife habitat. Re -cut drainage <br />ditches on the sides of the roadway. <br />5) Regraded and spread the topsoil. <br />6) Seeded and mulched the North Pit area as described in the revegetation plan. <br />Abridged Permit Document 5-21 Feb 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.