My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-23_HYDROLOGY - M2006003
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2006003
>
2009-12-23_HYDROLOGY - M2006003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:04 PM
Creation date
12/28/2009 1:37:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
HYDROLOGY
Doc Date
12/23/2009
Doc Name
Substitute Water Supply Plan
From
OSE
To
Civil Resources, LLC
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Andy Rodriguez, P.E. <br />December 22, 2009 <br />Page 2 <br />Depletions <br />Currently 0.56 acres of ground water surface is exposed in dewatering trenches at the <br />Parker - Dersham Mine (WDID 0203026). Consumptive use from the operation of this site <br />consists of 12.5 acre -feet of water lost in product (4% moisture of 425,000 tons of raw <br />material), 1.67 acre -feet for on -site dust control and 1.66 acre -feet of evaporation from the 0.56 <br />acres of exposed lake surface. The total consumption at this site from mining operations is <br />15.83 acre -feet. <br />The depletions from the mining operation were lagged to the stream using the SDF <br />method. The construction of the slurry wall at the Baseline Resource site affects the timing of <br />the lagged impacts on the South Platte River. The applicant previously prepared a numeric <br />model to account for this affect. According to the model, the SDF for the Batch Plant <br />production well (concrete production and dust suppression) was estimated to be 176 days and <br />the SDF for the evaporation loss and water lost in product was estimated to. be 205 days. <br />Replacements <br />The proposed source of replacement for this pit is nontributary ground water pumped <br />from an existing Laramie -Fox Hills aquifer well and fully consumable effluent leased from the <br />City of Aurora. <br />The nontributary Laramie -Fox Hills aquifer water will be withdrawn by an existing well <br />pursuant to permit no. 64750 -F. Additional information regarding the well is shown below: <br />Well Field WDID <br />None <br />Well Field Name <br />None <br />Relevant Water Right Case Number <br />None <br />Well WDID <br />0210166 <br />Well Name <br />Hall Irwin LFH 64750 -F <br />Relevant Well Permit <br />64750 -F <br />Well Location <br />NE' /4, NE % <, SE %, SEC 36, T1 N, R67W, 6TH PM <br />A uifer <br />- Laramie -Fox Hills <br />Allowable AF Amount <br />43.5 AF <br />Maximum Pumping Rate <br />100 gpm <br />The well is currently permitted for industrial, commercial and augmentation use. The <br />Applicant's accounting includes the 2% relinquishment requirement for the nontributary <br />Laramie -Fox Hills water. <br />In addition to replacing 10.86 acre -feet of depletions resulting from this mining operation <br />at the Parker - Dersham Pit, 17.29 acre -feet will be pumped from the Laramie -Fox Hills well to <br />replace depletions resulting from operations at the Baseline Resource site in accordance with <br />the C.R.S. 37 -90- 137(11) SWSP approved for Hall- Irwin. Since the Laramie -Fox Hills water is <br />being used as a replacement source for both plans, the applicant's accounting for each SWSP <br />must specify the total amount of Laramie -Fox Hills water released and the amount associated <br />with each SWSP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.