My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 12/22/2009, 7:54:04 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 12/22/2009, 7:54:04 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:22 PM
Creation date
12/22/2009 8:01:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009038
IBM Index Class Name
PERMIT FILE
Doc Date
12/21/2009
Doc Name
New NOI, Prospecting,Form 2
From
Mount Sneffels Mining Company, LLC
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII. TERMS AND CONDITIONS <br />A. U a bond Is required, it, must be furnished before approval of the plan of operations - <br />B. Information provided with this plan marked confidential will be treated in accordance with the agency's <br />laws, rules, and regulations. named herein andfor <br />C. Approval <br />oft pla <br />validily of any minConstitute <br />i n9 d Certification Of rum herein hip ip any person revogn <br />D. Approval of this plan does not relieve me of my responsibil'dy to comply with other applicable state or <br />federal laws, rules, or regulations. <br />If previously undiscovered cultural resources (historic or Prehistoric objects, artifacts or sites) are exposed <br />as a result of operations, those operations will not proceed <br />until notification is received from the Authorized <br />Officer that provisions for mitigating unforeseen impacts as fequired by 36 CFR 228A(e) and 36 CFR 800 <br />have been compiled with. .Anew or <br />F. This plan of operations has been approved for a period of or until (mm/ddVYY) <br />revised plan must be submitted in accordance with 36 CPR part 228, subpart A, if operations are to be <br />continued after that time period. <br />VIII. OPERATING PLAN ACCEPTANCE <br />to comply With all conditions in this plan of operations including t <br />[]IIoWe have reviewed and agreed I mitt and reclamation requirements.. <br />required flanges, modifications, specie gatio n <br />OVOWe understand that the bond will not be released until the Authorized Officer In charge gives written <br />approval. <br />Signature of Operator (or Authorized Representative) <br />(mm/ddlyY) <br />DL OPERATING PLAN APPROVAL <br />(fie) (Title) <br />Signature of (Authorized Officer) (Date) <br />(m m/ddl� <br />Burden and HN418a 1ninadon SWM=d ro a cde flan 0001,001 udem d GPs a raw o meot <br />Aooarrfrg p Mie Papernork Aeac6on Ad d 19x5, an agerKYmzq' nd oadni aaponsor, anda peisa►is b kepura� aobcWn is wed to arerW 12 han per re�or�e. <br />mr.w. The veld d16 mbol mV*W for Brs k*mWw "1" 1 ' n is 0596.00?2 w9Lj dad d <br />incirdag the t+me larrerie�irgi seen fig endstig flee aouroasr pa8�erinp SM 11m�7af <br />Tho US. Dapa rat of Awkuft m (UWQ t am in a• b P and adAw on The Ws& d race; cab►. rdiord adyin ap' dr9aliil, daffWk ad mre <br />dAtAns, taniial shade, Prerbl aft neipia►4 sand a OeneOlc irbmnaian. Danf�l balers, r�rkne4 crheea df ava d �ra7� wipe Print ardafay� ale) ahoild a>r t <br />Md al Pa►ebbdbasa 8A* b alP0W m) Pr retie tire dsab�es rdno nequie awbrnadre means forcarrrrasicafbr+ PmA+m <br />toad's TAFMT center ar 2aa•720,M Nei a and TM. <br />To ffe a mrp - 1 d daCir ..a Brie USDA, Diredo , 011ae d C" t4ft 14W- ndependenoe AvW^ SW N�a X10 a cal W f ee (M 6329992 (voixl. TDD tears <br />cw , fLemftaghbeafrdWcrftFeder t&Wat(8 V743 9OW)Or;WWw; Z(,fty 0 W0AisanegadoP w"*PA'i -W <br />(if mom s/wcr o aaaedad t fdl ora a block of iwfwwadow, ass &*W&1d ffkeM "da%U* forw) <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.