Laserfiche WebLink
standards based on the oti' led sdwule for construction, <br />H. Reclamation. Descnbe the annual and row reclamatio►r ' es and , <br />cuWerts a <br />operations, and project closure. Indude.such items as the removal of sbuct a b Including of a n 6 se into the d i kerts <br />rovayatatirorh plan, permanent coritarnment of mine far7ings, waste, or sludges monitoring and maintenance plans. <br />dosing ponds and eliminating s�tandrng water, a final surface shaPmg Plan, and Post operations <br />All drill holes will be plugged from first solid rock to total <br />depth with cement. Surface casing will be removed and the top <br />of the drill hole from first solid rock to surface will be filled <br />with existing surface materials. DRill cuttings will be saved and <br />used in the cementing process. A photographic record prior to <br />disturbance will be made. All drill sites and roads will be re- <br />contoured. Any topsoil or fines recovered during site and road <br />prep will be spread to enhance revegation. Sites will be reclaimed <br />VI.. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />A. Required changes/modificadons/special midigation for Plan of operations. <br />BL Bond. Reclamation of all disturbances connected with this Plan of operations is covered by Reclamation <br />Performance Bond No. dated (mmlddfyy) , signed by (Principal) and _ (Surety), for the <br />penal sum of . This Reclamation Performance Bond is a guarantee of faithM performance <br />with the temu and <br />conditions fisted below, and with the reclamation requirements agreed upon . in the plan of operations. This <br />Reclamation Performance Bond also extends to and includes any waulhorimed aivdies wed in connection <br />with this operation. <br />The bond amount for this Reclamation Performance Bond was based on a bond c abAWon worksheet The band amount may b e <br />. <br />adjusted dudM the term of this proposed plan of operations in response to dhanges in the operations or to changes ec Y <br />Both the Redamathn Performance Bond and the bond calculation worksheet are attadhed to and made part of this plan of <br />operations. Acceptable bond securities (subject to change) include: <br />1. Negotiable Treasury bc7h and notes which are unconditionally guaranteed as to both pri ple and interest in an amount <br />equal at their par value to the penal sum of the bond; or <br />2. Certified or cashier's dm* bank draft, Post Office money order. cash, assigned certificate of deposi , assigned sawngs <br />ac=K blanket bond,. or an irrevocable letter of as& equal to the penal sum of do bond . <br />o mom spoee is XamW t JW mR a He& of LifommdOn, we adMond she & aad a"ch fonw) <br />-6- <br />