My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-15_PERMIT FILE - M2009079
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009079
>
2009-12-15_PERMIT FILE - M2009079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:44 PM
Creation date
12/22/2009 8:01:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009079
IBM Index Class Name
PERMIT FILE
Doc Date
12/15/2009
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Precision Excavating, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Xxx <br />PROJECT IDENTIFICATION <br />Task # : 02a State : Colorado Permit/job# : M2009079 <br />Date <br />User <br />County : Moffat <br />Site :Peroulis Snake River Pit <br />Abbreviation : none <br />Filename : M079 -02a <br />12/15/2009 <br />GRM <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab <br />Shift basis : <br />1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown : <br />Ownership cost/hour: <br />$53.7 <br />NA <br />Operating cost/hour: <br />$70.63 <br />100 <br />Ripper op. cost/hour: <br />$1.59 <br />25 <br />Operator cost/hour: <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$164.49 Total fleet cost/hour : <br />$164.49 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 10,250 LCY factor : <br />NA volume : <br />10,250 <br />LCY <br />Source of estimated volume: avg. 1 ft depth blade of 60X4600 slope area <br />Source of estimated swell factor : <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(a vg.) <br />Average push distance : <br />60 feet <br />Material consistency: <br />1.20 <br />(Cat HB) <br />Unadjusted hourly production : <br />1,438.4 LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />_ (a <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1 <br />Loose stockpile <br />Spoil pile: <br />0.80 <br />(fnd -rf) <br />- -" — <br />Push gradient: <br />1.60 <br />(Cat HB) <br />Average push gradient: <br />30.00 % (neg) <br />Altitude : <br />1.00 <br />HB) <br />Average site altitude : <br />6,100 feet <br />Material weight: <br />0.90 <br />_(_Cat <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: <br />2,550 Ibs /LCY <br />Net correction : <br />0.86 <br />Weight description <br />Earth - Dry packed <br />Adjusted unit production : <br />1241.06 <br />LCY /hr <br />Adjusted fleet production : <br />1,241.06 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 Dozer(s) <br />Total job time : <br />8.26 <br />Hours <br />Unit cost: <br />$0.133 /LCY <br />Total job cost: <br />$1,359 <br />
The URL can be used to link to this page
Your browser does not support the video tag.