My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-15_PERMIT FILE - M2009079
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009079
>
2009-12-15_PERMIT FILE - M2009079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:44 PM
Creation date
12/22/2009 8:01:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009079
IBM Index Class Name
PERMIT FILE
Doc Date
12/15/2009
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Precision Excavating, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XXX <br />HOURLY PRODUCTION <br />Haul distance (feet) <br />_,. <br />Roll. res. ( %) <br />sheet 2 of 2 <br />Hauling Capacity: <br />Travel time (min.) ** <br />1 <br />500 <br />3.00 <br />Scraper Payload (weight) Basis : <br />6.00 <br />Scraper Bowl (volume) Basis: <br />0.39 <br />2 <br />Material weight: <br />2,550 pounds /LCY <br />Struck volume : <br />15.70 <br />LCY <br />Material description : <br />. <br />JOB TIME AND COST <br />Heaped volume: <br />21.00 <br />LCY <br />Earth - Dry packed <br />Hours <br />Average volume: <br />18.35 <br />LCY <br />Rated payload : <br />48,000 pounds <br />Adjusted capacity : <br />18.35 <br />LCY * ** <br />Payload capacity: <br />18.82 LCY <br />"" hourly production reflects volume per scraper pair on push -pull models <br />Cycle Time: <br />Job Condition Corrections : <br />Site altitude (ft.) : <br />6,100 <br />Scraper <br />Push dozer <br />Source <br />Scraper loading time * : <br />1.50 minutes <br />Altitude adj.: <br />1.000 <br />NA <br />(C at HB) <br />Maneuver and spread time : <br />0.60 minutes <br />Job efficiency: <br />0.830 <br />NA <br />(Cat HB) <br />* load time per scraper pair on push -pull models <br />Net correction : <br />0.830 <br />NA <br />Travel time : <br />Road condition description : Rutted dirt, little maintenance, no water, 2" tire penetration <br />W -1 Rnnfo <br />Seg. # <br />Haul distance (feet) <br />Grade ( %) <br />Roll. res. ( %) <br />Total res. ( %) <br />Velocity (fpm) <br />Travel time (min.) ** <br />1 <br />500 <br />3.00 <br />3.00 <br />6.00 <br />1855 <br />0.39 <br />2 <br />200 <br />16.00 <br />5.00 <br />21.00 <br />537 <br />0.25 <br />. <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />86.87 <br />Hours <br />Unit cost : $ 1.010 /LCY Total job cost : <br />$52,653 <br />Haul time : 0.64 minutes <br />Return route : <br />1 <br />200 <br />-16.00 <br />5.00 <br />-11.00 <br />2367 <br />0.13 <br />2 <br />500 <br />-3.00 <br />3.00 <br />0.00 <br />2921 <br />0.18 <br />scraper(s) <br />Adjusted single scraper team (unit) hourly production : <br />600.15 <br />LCY /hour <br />Adjusted multiple scraper team (fleet) hourly production : <br />600.15 <br />LCY /hour <br />. <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />86.87 <br />Hours <br />Unit cost : $ 1.010 /LCY Total job cost : <br />$52,653 <br />** travel time for each segment is adjusted for acceleration /deceleration. Return time : <br />0. <br />minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />3.05 <br />minutes <br />Unadjusted unit production /hour : 361.53 LCY /hour * ** Adjusted for job conditions : <br />300.07 <br />LCY /hour <br />Optimal number of scrapers per push dozer: NA Selected number of scrapers : <br />2 <br />scraper(s) <br />Adjusted single scraper team (unit) hourly production : <br />600.15 <br />LCY /hour <br />Adjusted multiple scraper team (fleet) hourly production : <br />600.15 <br />LCY /hour <br />. <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />86.87 <br />Hours <br />Unit cost : $ 1.010 /LCY Total job cost : <br />$52,653 <br />
The URL can be used to link to this page
Your browser does not support the video tag.