Laserfiche WebLink
V~v Blade type :_U niversal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3 -shank ripper <br />Data source : ( CRG) <br />Cost Breakdown: Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Utilization <br />$ 53.54 NA <br />$70.36 100 <br />$6.29 100 <br />$38.54 NA <br />$168.72 Total fleet cost/hour : $ 168.72 <br />MATERIAL QUANTITIES <br />Selected estimating method <br />Alternate methods - <br />Seismic: NA NA Load factor: NA Bank volume <br />Area : 30.00 acres Rip depth (ft): 2.00 Volume <br />Source of estimated quantity :standard depth, 30 ac pit floor <br />Source of estimated load factor NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: <br />NA <br />feet/second <br />Unadjusted production : <br />NA <br />cu-yds./hour <br />Area : Avg. ripping depth : <br />2.00 <br />feet/pass <br />Average ripping width : <br />7.08 <br />feet/pass <br />Average ripping length : <br />20000 <br />feet/pass <br />Average dozer speed : <br />8800 <br />feet/minute <br />Average maneuver time : ---- 6.25 <br />minutes /pass <br />Production per unit area : <br />0.773 <br />acres /hour <br />Unadjusted production: <br />2,494.6 <br />cu. yds. /hour <br />Area <br />NA BCY <br />96,800 BCY or CCY <br />Unadjusted production <br />per selected method : 2,494.65 cu. yds. /hour <br />Site altitude : 6,100 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (1 shif <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 2,070.56 cu. yds. /hour <br />Adjusted fleet production : 2, 070.56 cu. yds. /hour <br />