My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-02_PERMIT FILE - M1998022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1998022
>
2009-12-02_PERMIT FILE - M1998022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:52 PM
Creation date
12/7/2009 12:35:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
PERMIT FILE
Doc Date
12/2/2009
Doc Name
Reclamation liability review
From
DRMS
To
Tetra Tech, Inc.
Type & Sequence
CN1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 01a <br />Date : 1210212009 <br />User : GRM <br />Permit/job #: M-1998-022 <br />Abbreviation :none <br />Filename :M022-01a <br />Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Liability Estimate CN-01 <br />Task description : cut and fill any highwalls / excavations <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 320C <br />Horsepower : -138 <br />Weight (MT) : 19.70 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $26.97 NA Shiftbasis : 1 per day <br />Operating cost/hour : $32.00 100 Data source : (C:RG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $97.69 Total fleet cost/hour : $917.69 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,493 LCY factor : NA volume : 2,493 LCY <br />Source of estimated volume: accepted volumes from 2001 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket, swing empt <br /> Basic job condition description : AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock - Well blasted (60% - 75%) <br />Adjusted bucket capacity : 1.10 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,950 feet Altitude adjustment : 0.87 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.72 multiplier <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.582 per LCY <br />State :Colorado <br />County: Gunnison <br />Site :Conger Harvest Area <br />232.45 LCY/hour <br />167.85 LCY/hour <br />167.85 LCY/hour <br />Total job time : 14.85 hours <br />Total job cost : $1,451
The URL can be used to link to this page
Your browser does not support the video tag.