My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-02_PERMIT FILE - M1998022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1998022
>
2009-12-02_PERMIT FILE - M1998022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:52 PM
Creation date
12/7/2009 12:35:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
PERMIT FILE
Doc Date
12/2/2009
Doc Name
Reclamation liability review
From
DRMS
To
Tetra Tech, Inc.
Type & Sequence
CN1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action : CN-01 Reclamation Liability Estimate <br />Task description :rip and grade rock bench <br /> <br /> <br />HOURLY EQUIPMENT COST iiiw <br /> Basic machine : Cat D5G XL - 5P Horsepower : 90 <br /> Blade type :Power Angle Tilt <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $17.12 NA <br /> Operating cost/hour : $23.16 100 <br /> Ripper op. cost/hour : $0.51 25 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $79.32 Total fleet cost/hour : $79.32 <br /> <br />...:,:. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,630 LCY factor : NA volume : 2,630 LCY <br /> <br />Source of estimated volume :previously accepted volumes <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) _ <br />Average push distance : 50 feet Material consistency : 0.70 (Cat HB) <br />Unadjusted hourly production : 464.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Rock, avg. ripped or blasted Spoil pile : 0.80 (fnd-rl) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,920 feet Material weight : 0.78 (Cat HB)_ <br /> Blade type : 1.00 (PAT) <br />Material weight : 2,950 Ibs/LCY Net correction : 0.30 <br />Weight description <br />Traprock - broken Adjusted unit production : 140.70 LCY/hr <br /> Adjusted fleet production : 140.70 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 18.69 Hours <br />Unit cost : $0.564 /LCY Total job cost : $1,483 <br />
The URL can be used to link to this page
Your browser does not support the video tag.