2009-12-02_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-12-02_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:23 PM
Creation date
12/4/2009 3:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
12/2/2009
Doc Name
Partial Phase One Bond Release Reclamation Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
SL4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 State :Colorado Permit/job# : C-1981-033 <br />Date : 12/01/2009 County : Gunnison Abbreviation : none <br />User : SLB Site : Bear No. 3 Filename : C033-006 <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase 1 Bond Release <br />Task description :Regrade sediment pond <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $40.93 NA <br /> Operating cost/hour : $49.75 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $129.22 Total fleet cost/hour : $129.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,200 CCY factor : 1.125 volume : 5,850 LCY <br />Source of estimated volume :Estimate from Map 11-3 <br />Source of estimated swell factor : Division Estimate <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 60 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 955.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.70 (fnd-mt) <br />o Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.35 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 337.79 LCY/hr <br /> Adjusted fleet production : 337.79 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 17.32 Hours <br />Unit cost : $0.383 /LCY Total job cost : $2,238