My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-02_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-12-02_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:23 PM
Creation date
12/4/2009 3:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
12/2/2009
Doc Name
Partial Phase One Bond Release Reclamation Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
SL4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 007 State : Colorado <br />Date : 1210112009 County :Gunnison <br />User : SLB Site : Bear No. 3 <br />Permit/job# :C-1981-033 <br />Abbreviation :none <br />Filename : C033-007 <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase / Bond Release <br />Task description : Redistribute topsoil over facilities area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11- 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Horsepower: 240 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $40.93 NA <br /> Operating cost/hour : $49.75 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $129.22 Total fleet cost/hour : $129.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.125 volume : 5,625 LCY <br /> <br />Source of estimated volume: Permit application Volume p. 2.05-23R <br />Source of estimated swell factor : Division estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 311.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.60 ftd-so <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 104.77 LCY/hr <br /> Adjusted fleet production : 104.77 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 53.69 Hours <br />Unit cost : $1.233 /LCY Total job cost : $6,938 <br />
The URL can be used to link to this page
Your browser does not support the video tag.