My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-02_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-12-02_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:23 PM
Creation date
12/4/2009 3:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
12/2/2009
Doc Name
Partial Phase One Bond Release Reclamation Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
SL4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 005 State : Colorado Permit/job #: C-1981-033 <br />Date : 1210112009 County:Gunnison Abbreviation :none <br />User : SLB Site : Bear No. 3 Filename : C033-005 <br />Agency or organization name: CDRMS <br />Permit or other job action :Phase 1 Bond Release <br />Task description :Regrade ditches <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 325C L <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $37.15 NA Shiftbasis : 1 per day <br />Operating cost/hour : $43.69 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $119.56 Total fleet cost/hour : $119.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 330 CCY factor : 1.125 volume : 371 LCY <br />Source of estimated volume: Map 11-1 <br />Source of estimated swell factor : Division estimate <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swing em <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,000 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 386.42 LCY/hour <br />Adjusted hourly unit production : 320.73 LCY/hour <br />Adjusted hourly fleet production : 320.73 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 1.16 hours <br />Unit cost : $0.373 per LCY Total job cost : $138
The URL can be used to link to this page
Your browser does not support the video tag.