My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-08_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-11-08_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:51 PM
Creation date
12/2/2009 2:01:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
11/8/2009
Doc Name
Coal Preparation Plan and Associated Coal Handling Facilities
Section_Exhibit Name
Exhibit 81
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 81 <br />Mountain Coal Company, L.L.C. West Elk Mine <br />Coal Preparation Plant and Associated Coal Handling Facilities <br />Preliminary Proiect Schedule <br />MCC is currently conducting an engineer, procure and construct (EPC) bidding process that is expected to <br />conclude with a bid award to a major EPC firm on or before September 30, 2009. <br />The facilities described above must be fully- operational by mid -July of 2010 to meet West Elk Mine's <br />operational needs. No preliminary project schedules have been developed for this project, however, in order <br />to meet the July, 2010 commissioning date, site construction activities must commence as soon as possible <br />following the bid award date. <br />Structural Data <br />Table of Proposed Conveyors <br />Conveyor <br />Len th (ft) <br />Belt Width (in) <br />Structure Width / Tye <br />Cover or Enclosure Type <br />TC -1 <br />350 <br />36 <br />7'/ Open Steel Truss <br />3/ Hood Cover <br />PR -2 <br />2,000 <br />48 <br />10'/ Open Steel Truss <br />% Hood Cover <br />P -6 <br />200 <br />36 <br />8' / Open Steel Truss <br />3/ Hood Cover <br />PP -4 <br />550 <br />36 <br />8' / Open Steel Truss <br />3/ Hood Cover <br />P -3/P -5 <br />950 <br />36 <br />14'/ Open Steel Truss <br />3/ Hood Covers Each <br />P -4 <br />200 <br />48 <br />10' / Open Steel Truss <br />3/ Hood Cover <br />R -5 Ext. <br />250 <br />72 <br />84 ", Belt Structure Only <br />Enclosed in Reclaim Tunnel <br />Table of Proposed Buildings and Structures <br />Item <br />Length (ft) <br />Width (ft) <br />Height (ft) <br />Type* <br />Preparation Plant <br />109 <br />40 <br />148 <br />SSENC <br />Control /Lab Bldg. <br />50 <br />40 <br />30 <br />SSENC <br />TC- 1 /PR -2 Transfer & <br />Scalping Station <br />40 <br />20 <br />50 <br />SS <br />PR -2 Take-up Tower <br />24 <br />20 <br />80 <br />SS <br />Refuse Truck Bin <br />20 <br />20 <br />60 <br />SSB <br />Conveyor PR -2 Bents <br />14 <br />1 <br />700 <br />CBEL <br />Conveyor PP -4 Bents <br />12 <br />1 <br />200 <br />CBEL <br />Stack Tube #5 (ST -5) <br />1' Thick Wall <br />12 (Diameter) <br />109 <br />RCT <br />ST -5 Head House <br />20 <br />14 <br />40 <br />SS <br />* Structure Types: <br />SSENC — Structural Steel Building - Fully Enclosed with Metal Sheeting <br />SS — Structural Steel with No Siding or Enclosure <br />SSB — Fully Enclosed Structural Steel Bin <br />CBEL — Equivalent height (total) of conveyor bent (open structural steel — no siding) supporting structures <br />RCT — Reinforced Cylindrical Concrete Tower <br />08109- TR118; Rev. 09109- MR357 <br />
The URL can be used to link to this page
Your browser does not support the video tag.