Laserfiche WebLink
Exhibit 81 <br />Mountain Coal Company, L.L.C. West Elk Mine <br />Coal Preparation Plant and Associated Coal Handling Facilities <br />Table of Proposed Reinforced Concrete Floors, Footings and Other Structures <br />Item <br />Length (ft) <br />Width (ft) <br />Thickness (ft <br />Preparation Plant Footing (Equivalent Length) <br />308 <br />4 <br />2 <br />Preparation Plant Building Floor <br />42 <br />112 <br />2 <br />Control /Lab Building Footing (Eq. Length) <br />188 <br />4 <br />1 <br />Control /Lab Building Floor <br />42 <br />52 <br />1 <br />Refuse Truck Bin Foundation <br />20 <br />20 <br />1 <br />TC- 1/PR -2 Transfer Tower & Scalping Station Foundation <br />40 <br />20 <br />1 <br />Scalping Station Oversize Mat'1 Concrete Pit (Eq. Length) <br />60 <br />8 <br />1 <br />Conveyor TC -1 Bent Foundation <br />8 <br />2 <br />4 <br />Conveyor PR -2 Bent Foundation (20 total — size each) <br />8 <br />6 <br />4 <br />Conveyor PR -2 Micro Piles (40 total — size each) <br />40 <br />2 <br />2 <br />Conveyor PP -4 Bent Foundations (2 total — size each) <br />10 <br />2 <br />4 <br />Conveyors P -3/P -5 Bent Foundations (3 total — size each) <br />15 <br />2 <br />4 <br />Conveyor R -5 Reclaim Tunnel Walls (Eq. Length) <br />600 <br />10 <br />1.5 <br />Conveyor R -5 Reclaim Tunnel Floor and Roof (Eq. Length) <br />600 <br />20 <br />2 <br />HDPE Pipelines: <br />Water supply line = 8" x 2,300' <br />Water discharge line = 12" x 300' <br />Conveyor P -2 Bench cut volume estimated at 10,000 yards <br />q 08109- TR118; Rev. 09109- MR357 <br />