Pond RP -1 was dry at the time of the inspection. Embankments were stable and well vegetated at <br />the time of the inspection. The primary and emergency spillways were in compliance with no <br />problems noted. <br />Pond RP -2/3 contained a small amount of water in the upper cell with the lower cell dry at the time of <br />the inspection. No discharge was noted. The embankments were stable and well vegetated at the <br />time of the inspection. <br />Pond RP -4 was dry at the time of the inspection. The pond embankments were stable. No problems <br />were noted with the spillways at the time of the inspection. <br />Pond RP -5a was dry. The combination primary/emergency spillway found to be incompliance with no <br />problems noted. The embankments were well vegetated and stable. <br />Pond RR -1 was dry at the time of the inspection. Embankments were stable with no problems noted. <br />Primary riser and emergency spillway found to be in compliance. <br />Pond SS -1 was dry at the time of the inspection. Embankments appeared stable and well vegetated <br />whh no signs of damage. <br />Pond SS -2 was dry at the time of the inspection. No problems were noted. Embankments appeared <br />sti ble with good vegetation throughout. <br />Roadside ditches appeared to be in compliance with no problems noted. Diversion ditches around <br />RP -1, 2/3/4, and 5A were in compliance with no damage or maintenance issues noted. Facilities area <br />ditches appeared to be in compliance. <br />Deserado Mine has a 4'X4'X4' prefabricated Type II explosives magazine with associated cap <br />magazine at the explosive storage site. This magazine is for temporary storage of explosives, which <br />is permitted in the Deserado permit. Deserado Mine has an active ATF permit to store explosives <br />onsite. This permit was noted during the inspection of records and a copy of the permit will be <br />provided to the Division. <br />Refuse Pile - 2/3/4 was stable and well compacted at the time of the inspection. Grading appeared to <br />allow good run -off to ponds. Slight downcutting was noted on the north side of the pile. The <br />downcutting is not substantial at this point, but should be monitored. Refuse Pile - 5 contained <br />stockpiled refuse to be spread and compacted and was in the process of being compacted at the time <br />of the inspection. Both sites appeared to show good run -off to the ponds via the collection ditches. <br />face facilities in and around the office and maintenance facilities appeared to be in compliance. <br />problems were noted. <br />area around the rock dust tank RDH -2 and RDH -3 was stable at the time of the inspection with <br />problems noted. <br />load out area was stable at the time of the inspection. No problems were noted. <br />area in and around the slot storage appeared to be stable at the time of the inspection. No <br />sion was noted on the pad or the slopes of the pad at the time of the inspection. <br />