Laserfiche WebLink
General Mine Plan Compliance <br />B Vent Shaft 3 continues to seal the space between the annulus and the shaft <br />Degas borehole LWB 11 -3 was completed on 11111 the day before this inspection. The sight was <br />stable with no off -site impacts evident. <br />Nitrogen injection hole N9 -26 was in the process of being drilled at the time of the inspection. The <br />area was stable. Embankments were in place along with an active mud pit. No problems were noted <br />and no off site impacts were observed. <br />N9=26 <br />Reveaetation <br />Cheat grass continues to be problematic at the site, although there did not appear to be any problems <br />with weeds at the time of the inspection. Revegetation of the east portal and RP -1 was established <br />with good cover. <br />Reclamation Success <br />Deserado is in the process of reclaiming degas boreholes throughout the site. Sealing of the holes is <br />taking place with backfilling, regrading, and reseeding yet to occur. <br />Return Shaft #3 has been sealed., abandoned and marked. The area of the Return Shaft pad has yet <br />to be regarded and reseeded. The site is stable with no problems noted. <br />