amen <br />Earth 8 Environmental <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations J2 +00 ( + / -) and J6 +00 ( + / -), approximately <br />450 feet left of centerline to 50 feet right of centerline. Contouring was performed using <br />various CAT dozers and CAT excavators. Material generated as the cut progressed was pushed <br />down the slope. <br />E) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road between stations A28 +00 ( + / -) to <br />A36 +00 ( + / -). <br />F) Cut to Fill <br />1) VLF <br />A John Deere 850 excavator and a CAT 385 excavator excavated structural fill material from <br />the following areas: between stations E0 +00 ( + / -) and E4 +00 ( + / -), approximately 100 to 300 <br />feet right of centerline; between stations E22 +00 ( + / -) and E24 +00 ( + / -), approximately 0 to <br />100 feet right of centerline; between stations H1 +00 ( + / -) and H4 +00 ( + / -), approximately 0 to <br />100 feet left of centerline; between stations J26 +75 ( + / -) and J29 +00 ( + / -), approximately 100 <br />to 150 feet right of centerline; and between stations K1 +00 ( + / -) and K6 +00 ( + / -), <br />approximately 0 to 150 right of centerline. The structural fill material was loaded into CAT <br />777 haul trucks. <br />Prior to structural fill placement, existing fill temperature were monitored and to be or above <br />39 °F. Ambient were monitored on an hourly basis, by an AMEC representative during fill <br />placement. Fill temperatures averaged approximately 43 °F during the period of time the <br />ambient temperature was below 32 °F. <br />Structural fill material was placed in the following areas: between stations A30 +00 ( + / -) and <br />A36 +00 ( + / -), approximately 50 to 250 feet left of centerline; between stations 130 +00 ( + / -) and <br />134 +00 ( + / -), approximately 100 feet left of centerline to 100 feet right of centerline; between <br />stations B 10 +00 ( + / -) and B 15 +00 ( + / -), approximately 0 to 75 feet left of centerline; between <br />stations D0 +00 ( + / -) and D3 +00 ( + / -), approximately 0 to 30 feet right of centerline; between <br />stations E4 +00 ( + / -) and E23 +00 ( + / -), approximately 100 to 150 feet right of centerline; <br />between stations J6 +00 ( + / -) and J10 +00 ( + / -), approximately 400 to 450 right of centerline; <br />and between stations K6 +00 ( + / -) and K10 +00 ( + / -), approximately 75 to 100 feet right of <br />centerline. The structural fill material was spread using various CAT dozers in 18" to 24" lifts. <br />Each lift was moisture conditioned using a CAT 773 water truck (when necessary) and <br />compacted using a 10 -ton vibratory smooth drum compactor, passing over the entire fill <br />surface at least 4 times (method compaction technique is applicable). <br />Structural fill (processed ore) was placed within the Phase IV VLF, between stations G16 +00 <br />( + / -) and G30 +00 approximately 100 to 150 feet left of centerline. Existing processed ore was <br />placed using a CAT D -6 LGP dozer in 12" loose lifts and moisture conditioned using a CAT <br />773 water truck. Compaction was achieved using a 10 -ton vibratory smooth drum compactor. <br />Structural fill placement was observed by an AMEC representative constantly. Nuclear density <br />VLF Weekly Report WE 10.24.09.D.doc <br />