My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-16_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-11-16_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
11/20/2009 10:22:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/16/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 10/18/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth 8 Environmental <br />testing was performed with results averaging 95% of maximum dry density. Moisture density <br />relations were performed in accordance with ASTM D- 698 -07. <br />Blast pattern drilling was performed in the following areas: between stations A6 +50 ( + / -) and <br />A7 +50 ( + / -), approximately 0 to 70 feet left of centerline: between stations H2 +00 ( + / -) and <br />114 +00 ( + / -), approximately 30 to 80 feet right of centerline; and between stations J26 +75 ( + / -) <br />and J30 +25 ( + / -), approximately 0 to 150 feet right of centerline using three track mounted <br />drill rigs. Blasting was performed in these areas Monday (10/19/2009), Tuesday (10/20/2009), <br />Wednesday (10/21/2009), and Thursday (10/22/2009). <br />G) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material resumed at the South Cresson Clay Process. A CAT D -8 <br />dozer, a CAT 320 excavator, and a CAT 966 front -end loader were used to process the <br />material. <br />Location <br />Week <br />tons <br />Cumulative <br />Comments <br />So Cresson Clay Process in <br />3,908 <br />112,770 <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />3,908 <br />144,678 <br />H) ADR and Crusher Waterlines <br />HDPE pipe fusing was performed in the Ames lay down yard for the ADR and Crusher waterlines. <br />I) Miscellaneous <br />Demolition of the old maintenance and the old substation foundations continued. <br />Removal of the 84" culvert between stations D0 +00 ( + / -) and D2 +00 ( + / -) was performed using a <br />CAT 345 excavator. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft /Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />VLF Weekly Report WE 10.24.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.