My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-06_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-11-06_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:50 PM
Creation date
11/9/2009 10:47:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
11/6/2009
Doc Name
Incompleteness Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR83
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0+00 (from approximately station 40+00 to station 0+00 in the proposed design). This <br />change requires the creation of an overland channel (across contour) for the ditch and <br />relocates the lower portion of the ditch out of what appears to be the natural drainage. <br />Finally, based on proposed Map 33A, it appears as though the newly proposed East <br />Taylor Ditch will begin at an elevation of approximately 8,025 feet (versus the starting <br />elevation of just above 8,000 feet for currently approved East Taylor Ditch). This change <br />in the starting elevation, along with the change in the intercept point on the Taylor <br />Tributary Ditch, will change the overall slope of the East Taylor Ditch. <br />Taylor Tributary Ditch - Colowyo is proposing to lengthen the Taylor Tributary Ditch <br />by approximately 113 feet (from its currently approved length of 11,648 feet to a <br />proposed length of 11,761 feet). The ditch begins at approximately the same point (at an <br />elevation of approximately 7,900 feet). The lengthening of the ditch appears to be the <br />result of the addition of some meandering between stations 35+00 and 15+00. This 113 <br />foot lengthening of the ditch will have a very minor change on the overall slope of the <br />ditch. Colowyo is also proposing to change the intercept locations of the West Pit Ditch <br />and the Taylor Ditch. Currently, the approved design for the Taylor Tributary Ditch has <br />the West Pit Ditch intercepting it at approximately station 77+00. The proposed design <br />has the West Pit Ditch intercepting the Taylor Tributary Ditch at approximately station <br />79+00. Additionally, the approved design has the Taylor Ditch intercepting the Taylor <br />Tributary Ditch at approximately station 29+00. The proposed design has the Taylor <br />Ditch intercepting the Taylor Tributary Ditch at approximately station 34+00. <br />Taylor Ditch - Colowyo is proposing to shorten the Taylor Ditch approximately 400 feet <br />in length (from its currently approved length of approximately 1,500 feet to a proposed <br />length of approximately 1,100 feet). The overall slope of the Taylor Ditch is being <br />increased from approximately 14% to a proposed slope of approximately 16%. Within <br />that slope increase, however, is an even greater slope increase in the middle segment of <br />the ditch. Colowyo is proposing to increase the slope from approximately station 9+00 to <br />approximately station 3+00 from the currently approved slope of 12.5% (75 foot drop <br />over 600 feet) to a proposed slope of 25% (150 foot drop over 600 feet). This change <br />gives the proposed Taylor Tributary Ditch profile three distinct straight zones (relatively <br />flat zones at the top and bottom and the very steep zone in the middle). This is in contrast <br />with the more natural appearance of the currently approved profile for the Taylor Ditch, <br />which is a relatively constant slope over the entire 1,500 foot length of the ditch. <br />Colowyo is also proposing to change the location of where the Taylor Ditch intercepts the <br />Taylor Tributary Ditch. The currently approved intercept point is at approximately <br />station 29+00 of the Taylor Tributary Ditch. Colowyo is proposing to move that <br />intercept point of the Taylor Ditch to approximately station 34+00 of the Taylor <br />Tributary Ditch. <br />West Pit Ditch - The West Pit Ditch appears to remain unchanged. The length, the <br />starting and ending elevations and the configuration appear to be the same in Technical <br />Revision 83 as they are in the approved design. The only possible change is the intercept <br />point of the West Pit Ditch with the Taylor Tributary Ditch. In the currently approved <br />plan the West Pit Ditch intercepts the Taylor Tributary ditch at approximately station
The URL can be used to link to this page
Your browser does not support the video tag.