Laserfiche WebLink
10. Gas Well <br />There is a gas well located in Mining Area #2 which will remain intact through out mining. The <br />pipeline will be redirected once the new route has been mined out. A new pipeline will be laid <br />from the well to the existing line, which will then be hooked into the well as the old pipe is <br />disconnected. The old pipe will then be removed and mining of this area will take place. See <br />Map C-213. Four Corners Materials will pay for the pipeline move when the move is needed. All <br />work will be done by BP, the owner of the well. They have been contacted by FCM and have <br />proposed the plan described above. <br />Cugnini Pit, November 2009 D-15