My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_PERMIT FILE - M2009030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009030
>
2009-10-01_PERMIT FILE - M2009030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:55 PM
Creation date
10/6/2009 8:43:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009030
IBM Index Class Name
PERMIT FILE
Doc Date
10/1/2009
Doc Name
Adequate for approval & estimate of bond amount
From
DRMS
To
Coal Bed Creek Construction, Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />j <br />CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />ask #: 01b <br />Date : 1010112009 <br />User : RCO <br />State :Colorado <br />County :Dolores <br />Site : Cbci Gravel Pit <br />Permit/job# :M-2009-030 <br />Abbreviation :none <br />Filename :M030-01b <br />ncy or organization name : DBMS <br />Permit or otherjob action :New 110c permit <br />Task description :Spread construction debris over pit floor <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2:3-shank ripper <br />itial <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7,800 feet <br />Material weight : 3,000 Ibs/LCY <br />'ROVIDED WEIGHT DATA <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient <br />Altitude <br />Material weight : <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />(avg.) <br />1 shift/day) <br />(fnd-ro <br />(Cat HB) <br />(Cat HB) <br />(user) <br />110.30 LCY/hr <br />110.30 LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 4.53 Hours <br />Unit cost : $1.115 /LCY Total job cost : $557 <br /> . <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $30.80 NA <br />Operating cost/hour : $53.60 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $122.94 Total fleet cost/hour : $122.94 <br />Swell Loose <br />500 LCY factor : NA volume : 500 LCY <br />Source of estimated volume : per approved plan <br />Source of estimated swell factor :na <br />Average push distance : 50 feet <br />djusted hourly production :---444.6 LCY/hr <br />ial consistency description <br />Weight description : I
The URL can be used to link to this page
Your browser does not support the video tag.