My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_PERMIT FILE - M2009030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009030
>
2009-10-01_PERMIT FILE - M2009030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:55 PM
Creation date
10/6/2009 8:43:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009030
IBM Index Class Name
PERMIT FILE
Doc Date
10/1/2009
Doc Name
Adequate for approval & estimate of bond amount
From
DRMS
To
Coal Bed Creek Construction, Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date : 10/01/2009 <br />User : RCO <br />State : Colorado <br />County : Dolores <br />Site : Cbci Gravel Pit <br />Permit/job #: M-2009-030 <br />Abbreviation : none <br />Filename : M030-002 <br />Agency or organization name : DRMS <br />Permit or other job action : New 110c permit <br />Task description : Haul construction debris to be backrilled in pit <br /> <br />HOURLY <br />EQUIPMENT :COST <br />Basic machine: CAT 928G <br /> <br /> <br />orsepower <br /> <br /> <br />125 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $14.69 NA <br />Operating cost/hour : $29.34 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $82.57 Total <br />xxx: fleet cost/hour : $82.57 <br /> <br /> <br />........... .:.::: .::...::: <br />. . ..:.::.:::.:... :. ,:.;:. <br />;:. ..:.:.; :.::.:::.....: <br />MATERIAL QUANTITIES <br />; .. .. <br />Initial Swell Final <br />volume : 500 LCY factor : NA volume : 500 LCY <br />Source of quantity take-off : in approved mining plan <br />Source of estimated swell factor : NA <br /> <br /> <br /> <br />........... <br />HO' ..: _....._ _ ...................................................................... <br />URLY <br />PRODUCTION <br /> <br /> <br />Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.500 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Bank or broken material 0.040 (Cat HB) <br />Stockpile : Dumped by truck 0.020 (Cat HB) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : Inconsistent operation 0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />rvei cycle ume aaustment : u.1 uu minutes <br />Adjusted basic cycle time : 0.600 minutes <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />M Rolling res. <br />M Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 200 0.00 5.00 5.00 0.1411 (Cat HB) <br />Return route : 200 0.00 5.00 5.00 0.1411 (Cat HB) <br /> Total travel time : 0.2822 minutes <br />Loader Bucket Capacity Total cycle time : 0.882 minutes <br />Rated capacity : 2.50 LCY (heaped) . (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity: 2.75 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 7,800 feet Job efficiency factor : 0.83 (1 shiff/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 187.03 LCY/Hr <br />Adjusted hourly unit production : 155.24 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 155.24 LCY/Hr <br /> <br />JOB TIME AND COST : <br />Fleet size : 1 Loader(s) Total job time : 3.22 Hours <br />Unit cost: $0.532 /LCY Total job cost : $266
The URL can be used to link to this page
Your browser does not support the video tag.