Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />1 <br />X: x 11F. <br />XX X:- <br />::: .. <br />R <br />'OJECT IDENTIFICATION <br />Task # : 01c State :Colorado Permit/job# M--2009-030 <br />Date : 1010112009 County:Dolores Abbreviation :none-- <br />User: RCO Site :Cbci Gravel Pit Filename :M030-01c <br />Agency or organization name: DRMS <br />Permit or other job action : New 110c permit <br />Task description : Spread earthen cap over construction debris <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper, <br /> Data source: (CRG) <br />Utilizatio - <br />% <br />n <br />Cost Breakdown : Ownership cost/hour : $30.80 NA <br />Operating, cost/hour : $53.60 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $122.94 Total fleet cost/hour : $122.94 <br />Initial Swell Loose <br />volume : 202 LCY <br />I factor : NA volume : 202 LCY <br />Source of estimated volume :0.25 ac x 6 in depth cap <br />Source of estimated swell factor :na <br /> <br />HOURLY PRODUCTION <br />i ..... ... <br />Job Condition Correction Factors :::: <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 <br />l <br />__ feet Material consistency : 0.65 (user) <br />Ur <br />iadjusted hourly production : <br />444.6 LCY/hr Dozing method : 1.00 (gen.) <br />I <br />Material consistency description : Visibility: 1.00 (avg.) <br /> Job efficiency : 0.83 (1shift1day) <br />Us r provided factor Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,800 feet Material weight : 0.77 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,000 Ibs/LCY Net correction : 0.25 <br />We?ght description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 110.30 LCY/hr <br /> Adjusted fleet production : 110.30 LCY/hr <br /> <br />JOB TIME AND COST ....:: <br />Fleet size : 1 Dozer(s) Total job time : 1.83 Hours <br />Unit cost : $1.115 /LCY Total job cost : $225