Laserfiche WebLink
Agency or organization name: Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Push fill material back onto cut slope <br />:::::::................................................................................................................................................... <br />HOURLY E ................................... <br />QUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br />MATERIAL: QUANTITIES ::::::....... ...................................................... ........................................................................ ............................... ............................ <br />Initial Swell Loose <br />volume : 13,000 BCY factor : 1.330 volume : 17,290 LCY <br /> <br />Source of estimated volume: Operator estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION ::...._..... ..._._......_........_.._ __...._.. <br />Job Condition Correction Factors .: <br />.:::.:.::::.:::: <br />......._..._.............. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile: 0.80 (fnd-rf) <br /> Push gradient : 0.42 (Cat HB) <br />Average push gradient : 25.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.20 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />139.90 <br />559.60 <br />LCY/hr <br />LCY/h r <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 30.90 Hours <br />Unit cost : $1.462 /LCY Total job cost : $25,278