Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Push west fill to base of cut slope <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br />:::::' ::.::.............................. <br />................................ <br /> <br />MATERIAL QUANTITIES <br />.............................. <br /> <br />....................................................................... <br />.................................................................................................... <br />Initial Swell Loose <br />volume : 13,000 BCY factor : 1.330 volume : 17,290 <br />Source of estimated volume :Operator estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 400 feet <br />Unadjusted hourly production : 305.6 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % () <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.47 <br /> <br />Adjusted unit production : 144.79 <br />Adjusted fleet production : 579.16 <br />LCY <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd-rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 29.85 Hours <br />Unit cost : $1.413 /LCY Total job cost : $24,424