Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Move fill material from portal storage bench to base of cut <br />:::............................................................................................................................................................... <br />........................ <br />HOURLY: COST <br />QU <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br />::::::.. .... <br />....... <br />MATERIAL ...... <br />QUANTITIES <br /> <br />................................................... <br />.................................................... <br /> <br />:.::::::::::::::::::::::.::.:::::::::::::::::::::.:::::::::::::::::::: <br />....................................................................... <br /> <br />::.:::::.:::::•::.:::..:::::: <br />.............................. <br /> <br />.:::::::::::::.::::::::::::: <br />............................. <br />Initial Swell Loose <br />volume : 3,000 B CY factor : 1.330 volume:- 3,990 LCY <br /> <br />Source of estimate d volume :Operator estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION :;:; ........ _............__ .............__............... .. . ____........_ ........... <br />Jo . b Condition Correction Factors ............_ ....... ............. ............ <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 400 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 305.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 108.59 LCY/hr <br /> Adjusted fleet production : 434.37 LCY/hr <br /> <br />: .::::................ <br />JOB TIME AND COST ................................................... ........................................................................ .............................. ..... <br /> <br />....................... <br />Fleet size : 4 Dozer(s) Total job time : 9.18 Hours <br />Unit cost : $1.883 /LCY Total job cost : $7,515 <br />