Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: exc State : Colorado Permit/job #: C-80-007 <br />Date : 0412712009 County : Gunnison Abbreviation : none <br />User: TAK Site : West Elk Mine Filename : 0007-exc <br />Agency or organization name : CDRMS <br />Permit or other job action : C-80-007 <br />Task description : Calculation of Total fleet cost/hour <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 330C L <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $45.61 NA <br />Operating cost/hour : $61.06 100 <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $139.63 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 1 CCY factor : 1.165 <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $139.63 <br />Loose <br />volume LCY <br />Source of estimated volume : N/A <br />Source of estimated swell factor : N/A <br />- ----------- -- <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded. dump bucket. swina empty) <br />Basic job condition description <br />AVERAGE <br />Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.32 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity: 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,300 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 357.48 LCY/hour <br />Adjusted hourly unit production : 296.71 LCY/hour <br />Adjusted hourly fleet production : 296.71 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 0.00 hours <br />Unit cost : $0.471 per LCY Total job cost : $1