My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task #: gra <br />Date : 0412712009 <br />User: TAK <br />Agency or organization name : CDRMS <br />Permit or other job action :Midterm Review 6 <br />Task description : Calculation of total fleet costlhour <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H <br />State : Colorado <br />County : Gunnison <br />Site : West Elk Mine <br />Attachment no. 1 :NA <br />Attachment no. 2 : Multi-shank riWer <br />Horsepower: 215 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown Ownership cost/hour : $43.20 NA <br />Grader operating cost/hour : $48.51 100 <br />Ripper operating cost/hour : $3.11 100 <br />Operator cost/hour : $24.47 NA <br />Total unit cost/hour : $119.29 Total fleet cost/hour : $119.29 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 1,00 acres <br />Source of estimated acreage :NIA <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet ** <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 6,300 feet <br />Permit/job #: C-80-007 <br />Abbreviation : none <br />Filename :0007-ora <br />' at 0 degrees, blade is perpendicular <br />to direction of travel. <br />,* width of ripper beam on ripping applications <br />Source <br />Altitude adjustment factor : 1.00 I (Cat HB) <br />Job efficiency adjustment factor : a85 (1sh1d, mod.) <br />Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1.3008 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time <br />Unit cost : $91.71 per acre Total job cost : <br />0.77 hours <br />$92
The URL can be used to link to this page
Your browser does not support the video tag.