My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : com <br />Date : 27-Apr-2009 <br />User : TAK <br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br />State : Colorado <br />County : Gunnison <br />Site : West Elk Mine <br />Agency or organization name : CDRMS <br />Permit or other job action :Midterm Review 6 <br />Task description : Calculation of Total fleet cost(hour <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 826G Series 11(2005) <br />Horsepower: 340 <br />Compactor type : Sanitation - chopper foot Shift basis : 1 per day <br /> Utilization % Data source: (CRG) <br />Cost Breakdown : Ownership cost/hour : $63.47 NA - <br />Operating cost/hour : $121.03 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $217.28 Total fleet cost/hour : $217.28 <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 1 LCY factor : 0.750 volume : 1 CCY <br />Source of estimated volume: NIA <br />Source of estimated shrinkage factor :N/A <br />HOURLY PRODUCTION <br />Unadiusted hourly Droduction = (W x S x L x C) / P <br />Compacted width per pass (W) : 7.84 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 5 passes <br />Unadjusted hourly unit production : 1,226.80 CCY/hr <br />Job Condition Correction Factors <br />Site altitude : 6,300 feet <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time <br />Unit cost $0.213 per CCY Total job cost <br />Permit/job # : C-80-007 <br />Abbreviation :none <br />Filename :0007-com <br />1,018.25 CCY/hr <br />1,018.25 CCY/hr <br />0.00 hours <br />$0
The URL can be used to link to this page
Your browser does not support the video tag.