My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: rip State : Colorado Permit/job #: C-80-007 <br />Date : 0412712009 County :Gunnison Abbreviation :none <br />User : TAK Site : West Elk Mine Filename : 0007-rip <br /> <br />Agency or organization name : CDRMS <br />Permit or other job action : Midterm Review 6 <br />Task description : Calculation of Total fleet cost/hour <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $70.58 NA <br />Dozer operating cost/hour:- $103.27 100 <br />Ripper operating cost/hour : $7.52 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $214.14 Total fleet cost/hour : $856.57 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : 1.00 <br />NA <br />acres <br />Selected estimating method : Area <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.00 Volume <br />Source of estimated quantity MA <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />NA <br />1,613 <br />BCY <br />BCY or CCY <br />Unadjusted production <br />per selected method : 1,229.44 cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 7,000 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.762 acres/hour Adjusted unit production : 1,020.43 cu. yds./hour <br />Unadjusted production : 1,229.44 cu. yds./hour Adjusted fleet production : 4,081.73 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 0.40 hours <br />Unit cost : $0.210 per cu. yd. Total job cost : $339
The URL can be used to link to this page
Your browser does not support the video tag.