My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : doz <br />Date : 0412712009 <br />User: TAK <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency or organization name : CDRMS <br />Permit or other job action : Midterm Review 6 <br />Task description : Calculation of Total fleet cost/hour <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $830.14 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1 CCY factor : 1.165 volume : 1 LCY <br /> <br />Source of estimated volume : N/A <br />Source of estimated swell factor : N/A <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 680 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 490.84 LCY/hr <br /> Adjusted fleet production : 1,963.37 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.00 Hours <br />Unit cost : $0.423 /LCY Total job cost : $0 <br /> <br />State : Colorado <br />County: Gunnison <br />Site : West Elk Mine <br />Permit/job# : C-80-007 <br />Abbreviation :none <br />Filename :0007-doz
The URL can be used to link to this page
Your browser does not support the video tag.