Laserfiche WebLink
QnenARI P Fn1 uannGNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/houdunit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Generic 10-12 cy, 6x4 $74.83 6 $448.96 $448.96 <br />-tube Truck, 6x4, 210 HP $90.85 1 $90.85 $90.85 <br />-Fuel Tanker, 6x4, 210 HP $63.52 1 $63.52 $63.52 <br />-Flatbed Truck, 6x4, 45K GVW $63.01 1 $63.01 $63.01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $666.34 $666.34 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 120.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 3.43 3.43 Total non-roadable mob/demob cost $33,032.61 <br />Return time (hours) = 3.43 3.43 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA _ Total roadable mob/demob cost ** : $4,569.19 <br />Unloading time (hours) = 0.50 NA •* one round trip, no haul rig <br />Subtotals = 7.86 6.86 <br />JOB TIME AND COST Total job time : 15.71 hours <br /> Total job cost : $37,602