Laserfiche WebLink
Demolition Work <br />Page 1 of 3 <br />Protect Identification <br /> Agency or organization name : Colorado Division of Reclamation, Mining and Safety <br />Task #: 301 PennWjob#: C-80-007 <br />Date: 6/3/2009 Abbreviation: N/A <br />User: TAK Site: West Elk Mine Filename: <br />Permitting action: Midterm Review 6 (2009) Source of unit costs: CIRCES <br />Task description: Demolish and remove all structures in Sylvester Gulch, Shaft #3, and Syl. G. road ext. Location adjustment: $0.92 <br /> Last unit cost update: 7/112007 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAB. TOTAL <br /> ft ft ft If in (100% LIAB.) (ACTUAL) <br />Sylvester Gulch Fen , <br />Superstructure 120 20 10 24,000 CF Demo/disp./existing pit-10K'haul $0.20 $4,824.00 100% $4,824.00 <br />Floor 120 20 12 2,400 SF Demo.disp exc. pit, 12" th. - 200 ft. $4.01 $9,624.00 100% $9,624.00 <br />Footings 2 3 280 280 LF Demo/disp./exc. pit, 2'X3'-200 ft. $24.08 $6,742.40 100% $6,742.40 <br />Shaft #3 <br />Collar 12 12 2 452 SF Concr, demo. only, ave. reinf., 24°th. $8.50 $3,842.00 100% $3,842.00 <br />Screen enclosure 12 12 6 864 CF Demo/disp./exc. pit - IOK'haul $0.22 $188.35 100% $188.35 <br />Concrete barriers 15 10 150 SF Concr., demo. only, ave. reinf., 24" th. $8.50 $1,275.00 100% $1,275.00 <br />Hoist and wench foundations 10 58 3 64 CF Demo/disp./exc. pit-1OK'haul $0.22 $13.95 100% $13.95 <br />Emergency escape capsule facility <br />Building 10 16 10 1,600 CF Demo/disp./exc. pit- IOK haul $0.22 $348.80 100% $348.80 <br />Foundation 6 6 36 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $72.36 100% $72.36 <br />Ventilation facility intake shaft <br />Collar 34 15 4 CY Concr, pave., demo., 7-24" lh., mind. $92.00 $368.00 100% $368.00 <br />Collar b-(looter 43 40 4.0 255 CF Demo/disp./exc. pit - 10K' haul $0.22 $55.59 100% $55.59 <br />Exhaust shaft collar 28 12 88 SF Oemoxisp exc. pit, 12"th.-200 ft. $4.41 $388.08 100% $388.08 <br />Base/footer 34 42 4 212 CY Concr. paw., demo., 7-24" th., reinf. $92.00 $19,504.00 100% $19,504.00 <br />Main fanstmotor houses 8 10 4 12 CY Concr. paw., demo., 7-24th., reinf. $92.00 $1,104.00 100% $1,104.00 <br />Main fans/motor houses 8 10 4 12 CY Concr, paw, demo., 7-24" th., reinf. $92.00 $1,104.00 100% $1,104.00 <br />Fan ducting 4 10 560 22,400 CF Demo/disp./exc, pit - IOK' haul $0.22 $4,883.20 100% $4,883.20 <br />Mein road <br />Concrete barriers 350 350 EA Railing, roadside quidemil posts only $10.46 $3,661.00 100% $3,661.00 <br />Guardrail 1750 1,750 LF Railing, roadside guiderail and posts $9.38 $16,415.00 100% $16,415.00 <br />Powedines <br />Transmission lines and poles 21600 21,600 LF Power/telephone line, wood -Double or H pole $5.11 $110,376.00 100% $110,376.00 <br />Fire optic cable 7200 7,200 LF Power/telephone line, wood - Double or H pole $5.11 $36,792.00 100% $36,792.00 <br />Overhead distribution lines and poles 56700 56,700 LF Power/telephone line, wood - Double or H pole $5.11 $289,737.00 100% $289,737.00 <br />Detention pond (TR-83, Exhibit 69) <br />Headwall 20 10 1 200 SF Demo.disp exc. pit, 12" th. - 200 ft. $4.41 $882.00 100% $882.00 <br />48' culvert 100 48 100 LF Pipe, CMP-48 in. diem. $6.19 $619.00 100% $619.00 <br />Concrete ditch s. side shaft bench 1 7 2 622 CY Slab on grede, demo. only, rod reinforc. $80.82 $50,270.04 100% $50,270.04 <br />Sediment pond apron 40 90 6 3,600 SF Demo.disp exc. pit, 6'th. - 200 ft. $2.01 $7,238.00 100% $7,236.00 <br />Tie-beck/concrete retaining well 35 380 13,300 SF Wall, block., demo. only, heavy rent., 12" th. $1.84 $24,472.00 100% $24,472.00 <br />Tie-back/concrele retaining wall 20 400 8,000 SF Wall, block., demo. only, heavy mint., 12" th. $1.84 $14,720.00 100% $14,720.00 <br />Pump station and treatment (TR-83, Exhibit 69) <br />Superstructure 60 80 30 144,000 CF Demo/disp./exc. pit-1OK'haul $0.22 $31,392.00 100% $31,392.00 <br />Floor 80 60 10 4,800 SF Demo.disp exc. pit, 10" th. - 200 ft. $3.35 $16,080.00 100% $16,080.00 <br />Footings 2 3 292 292 LF Demo/disp./ex, pit, 2X3'- 200 ft. $24.08 $7,031.36 100% $7,031.36 <br />Pre-sedimentation basin (TR-83, Exhibit 69) <br />Walls 14 405 5,670 SF Wall, block., demo. only, heavy reinf., 12" tK $1.84 $10,432.80 100% $10,432.80 <br />Floor 40 70 1.3 130 CY Slab on grade, demo. only, rod reinforc. $80.82 $10,476.67 100% $10,476.67 <br />Sludge drying lagoons (TR-83, Exhibit 69) <br />Walls 10 1460 14,600 SF Well, block., demo. only, heavy reinf., 10" th. $1.84 $26,864.00 100% $26,864.00 <br />Floor tt## 32 8 36,400 SF Demo.disp exc. pit, 8" th. - 200 ft. $2.68 $97,552.00 100% $97,552.00 <br />Fence 1140 1,140 LF Fencing, chain link - 8 to 10 ft. high $2.25 $2,565.00 100% $2,565.00 <br />Syl. G. Bulk Rock Dust Storage/Supply Fac. (MR-297) <br />Support building 12 20 10 2,400 CF Demo/disp./exc. pit - 209 push $0.21 $511.20 100% $511.20 <br />Concrete pad 12 20 6 240 SF Demo.disp axis. pit, 6" th. - 200 ft. $1.95 $468.00 100% $468.00 <br />Mine ventilation intake air heaters (MR-299) <br />Pump building 20 40 10 8,000 CF Demo/disp./exc. pit- 200' push $0.21 $1,704.00 100% $1,704.00 <br />Concrete slab 40 20 18 44 CY Concr. paw., demo., 7-24" th., mind. $92.00 $4,048.00 100% $4,048.00 <br />HDPE pipe 2700 2,700 LF Pipe, sewer/water- 12 in. diem. $5.70 $15,390.00 100% $15,390.00 <br />Transport sew. tank to landfill ,0001 1 EA Haul to cert. Dump-9K-12K gal. $1,050.00 $1,050.00 100% $1,050.00 <br />Remove 4 bath houses 4 X 2 40 10 800 CF Demo/disp./axc. pit - 1 OK' haul $0.22 $174.40 100% $174.40 <br />Remove office 12 55 10 6,600 CF Demo/disp./exc. pit - 1 OK' haul $0.22 $1,438.80 100% $1,438.80 <br /> Total for this page before location adjustment $1,673,435.00 $836,696.00 <br /> Location adjustment: 92.32% Total for this page after location adjustment $1,544,915.19 $772,437.75