My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
9/30/2009 10:57:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demolition Work <br /> Page 1 of 1 <br />Prolect Identification <br /> Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />Task #: 201 Permit/job#: C-80-007 <br />Date: 412712009 Abbreviation: N/A <br />User: TAK Site: West Elk Mine Filename: <br />rmitting action: Midterm Review 6 (2009) Source of unit costs: CIRCES <br />tsk description: Demolish and reprove all structures in RPE and NSSA Location adjustment: 92.32% <br /> Last unit cost update: 7/1/2007 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAB. TOTAL <br /> ft ft ft If in (100% LIAB) (ACTUAL) <br /> 0 $0.00 <br />Demolish 2400 sf of 6"-thick, rebar reinf. Concrete 60 40 2,400 CF Demo/disp./existing pit - 200' push $0.1950 $468.00 100% $468.00 <br /> 0 <br /> 0 <br /> 0 <br />Culverts: 0 <br />CSLY-1 21 55 55 LF Pipe, CMP-21 in. diem. $2.9300 $161.15 100% $161.15 <br />CSLY-2 84 45 45 LF Pipe, CMP-84 in. diam. $28.0200 $1,260.90 100% $1,260.90 <br /> 0 <br />RPE vent shaft site (approved TR-105, not constructed, removed from permit app. in MT-6) <br />Fence 6 100 100 LF Fencing, chain link - to 6 ft. high $1.8200 $182.00 0% $0.00 <br />Fan enclosure/control building 22 21.5 15 6,998 CF Demo/disp./exc. pit - 10K' haul - Concr. $0.1920 $1,343.66 0% $0.00 <br />Fan, drives, control equipment 35 20 700 0 Demo/disp./existing pit - 50' push $0.1480 $103.60 0% $0.00 <br />Concrete pad 50 20 10 1,000 SF Demo.disp exis. pit, 10' th. - 50 ft. $3.2500 $3,250.00 0% $0.00 <br />Steel liner in shaft collar 120 12 HR Torch cutting, Means 400015906360 $64.8000 $777.60 0% $0.00 <br />Concrete shaft collar 16.5, 20 1 4 HR Hydraulic hammer on excavator $137.0000 $548.00 0% $0.00 <br />Powedine and poles 700 700 LF Pomr/telephone line, mod - Double or H pole $4.9800 $3,486.00 0% $0.00 <br />0 <br />Location adjustment: 92.32% <br />0 <br />Total for this page before location adjustment $11,580.91 <br />Total for this page after location adjustment $10,691.50 <br />$1,890.05 <br />$1,744.89 <br />$1,744.89 <br />Grand total for this task after location adjustment
The URL can be used to link to this page
Your browser does not support the video tag.