Task K: 301
<br />STRUCTURE or ITEM DESCRIPTION
<br /> ft ft ft
<br />Sylvester Gulch Ventilation Shaft #1 (approved MR-305)
<br />Demo concrete pad for transformers 8 12
<br />Remove transformers
<br />Remove fence 8 12
<br />Remove 10,000-gal. water tank 10,0009.1
<br />Remove 10,000 gal septic tank 10,000 gal
<br />Remove raw sewage fttank 5,000 gal
<br />Transport sew. tank to landfill 10,000 gal
<br />Remove 4 bath houses 4 X 2 40 10
<br />Remove office 12 55 10
<br />Building addition and foundation, Shaft #2 Compressor Bldg. (MR-310)
<br />Building 15 40 12
<br />Pad 15 47
<br />Aboveground steel water line in Sylvester Gulch (approved MR-323)
<br />Cut into 30' lengths (12' diam.)
<br />Load and haul offsile 30 87
<br />Above-ground HOPE water line in Sylvester Gulch (approved MR-323)
<br />Cut into 30' lengths (12" diem.)
<br />Load and haul offsile 30 166
<br />2 Water pumps in Sylvester Gulch (approved MR-323)
<br />Sylvester Gulch Rd. Extension (approved TR-99)
<br />Barbed wire fence with posts
<br />16' long steel gate
<br />Headwall - inlet of 84' culvert 11 11
<br />Headwall - outlet of 84" culvert it 11
<br />Silt fence ###
<br />Geotextile ###
<br />4 manhole covers
<br />Culverts:
<br />CCW-1A"
<br />CCW-1 B'
<br />CCW-2+
<br />CSLY-25"
<br />CSLY-2B
<br />CSLY-2C
<br />CSLY-3
<br />CSLY-4
<br />CSLY-5
<br />CSLY-8
<br />CSLY-7
<br />CSLY-8
<br />CSLY-9
<br />CSLY-10
<br />CSLY-11
<br />CSLY-12
<br />CSLY-13
<br />CSLY-14
<br />CSLY-15
<br />CSLY-17
<br />CSLY-18
<br />CSLY-19
<br />CSLY-20
<br />CSLY-21
<br />CSLY-22
<br />CSLY-23
<br />CSLY-24
<br />CSLY-28
<br />CSLY-29
<br />Shaft 3 exhaus t fen (MR-337)
<br /> Superstructure 120 20 10
<br /> Floor 130 31
<br /> Footings 2 3
<br />Vent Shaft 1 Compressor Building (MR-339)
<br />QUANTITY UNIT CIRCES DEMO. MENU SELECTION
<br />If in
<br />8 96 SF Demo.disp exc. pit, 8" th. - 200 ft.
<br />2 EA Trensfonnerremoval
<br />40 40 LF Fencing, chain link-8 to 10 ft, high
<br />1 EA Exc/load non-leaking-9K-12Kgal.
<br />1 EA Exc/load non-leaking-9K-12Kgal.
<br />1 EA Exc/load non-leaking-9K- 12Kgal.
<br />1 EA Exc/load non-leaking-9K-12Kgal.
<br />4,800 CF Demo/disp./ex, pit- 10K' haul
<br />6,600 CF Demo/disiodexc. pit -10K' haul
<br />7,200 CF Demo/disp./exc. pit- 10K' haul
<br />39 CY Slab on grade, demo. only, rod reinforc.
<br />Page 2 of 3
<br />UNIT COST TOTAL COST % LIAB. TOTAL
<br />$2.68 $25814 100% $258.24
<br />$1,500.00 $3,000.00 100% $3,000.00
<br />$2.25 $85.20 100% $85.20
<br />$1,005.00 $945.00 100% $945.00
<br />$1,005.00 $945.00 100% $945.00
<br />$1,005.00 $261.00 100% $261.00
<br />$1,005.00 $875.00 100% $875.00
<br />$0.22 $864.00 100% $864.00
<br />$0.22 $1,188.00 100% $1,188.00
<br />$0.22 $1,569.60 100% $1,569.60
<br />$80.82 $3,151.98 100% $3,151.98
<br />2610 2,610 LF Pipe, se-ft.ter- 12 in. diem. $5.70 $14,877.00 100% $14,877.00
<br /> 12 2,610 CY Load/5 mi. haul, slvg - Steel fr. $7.25 $18,922.50 100% $18,922.50
<br /> 4,980 LF Pipe, sewerhvater- 12 in. diem. $5.70 $28,386.00 100% $28,386.00
<br />4980 12 4,980 CY Load/5 mi. haul, slvg - Masonry $7.60 $37,848.00 100% $37,848.00
<br /> 37 CY Load/5 mi. haul, slvg - Steel fr. $7.87 $291.19 100% $291.19
<br /> 95 LF Fencing, barbed wire - 5 strand $1.64 $155.80 100% $155.80
<br />95
<br /> 16 LF Fencing, chain link -to 6 ft. high $1.92 $30.72 100% $30.72
<br />16
<br /> 12 125 SF Demo.disp axis. pit, 12" the 10,000 ft. $4.35 $542.14 100% 5542.14
<br /> 12 125 SF Demo.disp axis. pit, 12" the 10,000 ft. $4.35 $542.14 100% $542.14
<br /> 4,518 LF Fencing, barbed wire-5 strand $1.64 $7,409.52 100% $7,409.52
<br />4518 7,510 CF Demo/disp./exc, pit - 10K' haul $0.22 $1,637.18 100% $1,637.18
<br />20 20 SY Concr, pave., demo., to 6" th., rod reinf. $10.53 $210.60 100% $210.60
<br /> 300 LF Pipe, RCP-48 in. diem. $15.48 $4,644.00 100% $4,644.00
<br />300 2,130 LF Pipe, RCP-60 in. diem. $17.22 $36,678.60 100% $36,678.60
<br />2130 60 LF Pipe, CMP-12 in. diam. $2.17 $130.20 100% $130.20
<br />60
<br /> 40 LF Pipe, CMP - 18 in. diam. $2.35 $94.00 100% $94.00
<br />40
<br /> 50 LF Pipe, CMP -72 in. diem. $25.69 $1,284.50 100% $1,284.50
<br />50 50 LF Pipe, CMP -48 in. diem. $6.19 $309.50 100% $309.50
<br />50 50 LF Pipe, CMP - 30 in. diem. $4.42 $221.00 100% $221.00
<br />50 50 LF Pipe, CMP-30 in. diem. $4.42 $221.00 100% $221.00
<br />50 50 LF Pipe, CMP-30 in. diem. $4.42 $221.00 100% $221.00
<br />50 60 LF Pipe, CMP-30 in. diem. $4.42 $265.20 100% $265.20
<br />60 60 LF Pipe, CMP-24 in. diem. $3.15 $189.00 100% $189.00
<br />60 80 LF Pipe, CMP -24 in. diem. $3.15 $252.00 100% $252.00
<br />80 90 LF Pipe, CMP - 30 in. diem. $4.42 $397.80 100% $397.80
<br />90 90 LF Pipe, RCP -84 in. diem. $50.77 $4,569.30 100% $4,569.30
<br />90 60 LF Pipe, CMP-24 in. diam. $3.15 $189.00 100% $189.00
<br />60 60 LF Pipe, CMP-24 in. diam. $3.15 $189.00 100% $189.00
<br />60 60 LF Pipe, CMP- 18 in. diam. $2.35 $141.00 100% $141.00
<br />60 50 LF Pipe, CMP -30 in, diem. $4.42 $221.00 100% $221.00
<br />50 120 LF Pipe, RCP .84 in. clam. $50.77 $6,092.40 100% $6,092.40
<br />120 60 LF Pipe, CMP -30 in. diam. $4.42 $265.20 100% $265.20
<br />60 240 LF Pipe, CMP-84 in. diam. $28.02 $6,724.80 100% $6,724.80
<br />240 270 LF Pipe, CMP-30 in. diam. $4.42 $1,193.40 100% $1,193.40
<br />270 60 LF Pipe, CMP-84 in. diem. $28.02 $1,681,20 100% $1,681.20
<br />60 40 LF Pipe, CMP-24 in. diem. $3.15 $126.00 100% $126.00
<br />40 60 LF Pipe, CMP -30 in. diem. $4.42 $26510 100% $265.20
<br />60 50 LF Pipe, CMP - 30 in, diam. $4.42 $221.00 100% $221.00
<br />50 70 LF Pipe, CMP - 18 in. diam. $2.35 $164.50 100% $164.50
<br />70 45 LF Pipe, CMP - 18 in. diem. $2.35 $105.75 100% $105.75
<br />45 60 LF Pipe, CMP - 18 in. diam. $2.35 $141.00 100% $141.00
<br />60
<br />Superstructure 30 45.1 14
<br />Concrete floor 64.5
<br />Remove compressors cycle
<br />Remove 1400' of 8'-diamelre HOPE in So. G. extension rd.
<br />Load and haul 1400' of 6"-diameter HDPE f/ Syl. G. extension rd. 1400
<br />Dispose HOPE f/Syl. G. extension rd.
<br />Remove 280' of 6"-diameter ductile steel pipe (N2 at #2 Shaft, MR-349)
<br />Load/haul 280' of 6'-diameter ductile steel pipe (N2 at #2 Shaft, MR-349) 280
<br />Dispose 280' of 6"-diameter ductile steel pipe (142 at #2 Shaft, MR-349) 280
<br />24,000 CF Demo/disp./exc. pit - 10K' haul $0.22 $5,232.00 100% $5,232.00
<br />8 4,030 SF Demo.disp exc. pit, 8" th. - 200 ft. $2.68 $10,800.40 100% $10,800.40
<br />280 LF Demo/disp./exc. pit, 2'X3'-200 ft. $24.08 $6,742.40 100% $6,742.40
<br />18,950 CF Demo/disp./exc. pit-10K'haul $0.22 $4,131.19 100% 54,131.19
<br />65 SF Demo.disp a=. pit, 12" lh. - 200 ft. 54.01 $258.65 100% $258.65
<br />2 EACH $500.00 $1,000.00 100% $1,000.00
<br />1,400 LF Pipe, CMP- 8 in. diam. $1.62 $2,268.00 100% $2,268.00
<br />92 CY Loading and 2 mile haul, no salvage - Hand loading $30.70 $2,824.40 100% $2,824.40
<br />92 CY Dump fees- Building construction materials. $90.00 $8,280.00 100% $8,280.00
<br />280 LF Pipe, CMP - 8 in. diam. $1.62 $453.60 100% $453.60
<br />16 CY Loading and 2 mile haul, no salvage - Machine loading $13.35 $217.45 100% $217.45
<br />16 CY Dump fees- Building construction materials. $90.00 $1,465.99 100% $1,465.99
<br />Total for this page before location adjustment $469,798.87 $234,867.43
<br />Location adjustment: 92.32% Total for this page after location adjustment $433,718.32 $216,829.62
|