Laserfiche WebLink
Task K: 301 <br />STRUCTURE or ITEM DESCRIPTION <br /> ft ft ft <br />Sylvester Gulch Ventilation Shaft #1 (approved MR-305) <br />Demo concrete pad for transformers 8 12 <br />Remove transformers <br />Remove fence 8 12 <br />Remove 10,000-gal. water tank 10,0009.1 <br />Remove 10,000 gal septic tank 10,000 gal <br />Remove raw sewage fttank 5,000 gal <br />Transport sew. tank to landfill 10,000 gal <br />Remove 4 bath houses 4 X 2 40 10 <br />Remove office 12 55 10 <br />Building addition and foundation, Shaft #2 Compressor Bldg. (MR-310) <br />Building 15 40 12 <br />Pad 15 47 <br />Aboveground steel water line in Sylvester Gulch (approved MR-323) <br />Cut into 30' lengths (12' diam.) <br />Load and haul offsile 30 87 <br />Above-ground HOPE water line in Sylvester Gulch (approved MR-323) <br />Cut into 30' lengths (12" diem.) <br />Load and haul offsile 30 166 <br />2 Water pumps in Sylvester Gulch (approved MR-323) <br />Sylvester Gulch Rd. Extension (approved TR-99) <br />Barbed wire fence with posts <br />16' long steel gate <br />Headwall - inlet of 84' culvert 11 11 <br />Headwall - outlet of 84" culvert it 11 <br />Silt fence ### <br />Geotextile ### <br />4 manhole covers <br />Culverts: <br />CCW-1A" <br />CCW-1 B' <br />CCW-2+ <br />CSLY-25" <br />CSLY-2B <br />CSLY-2C <br />CSLY-3 <br />CSLY-4 <br />CSLY-5 <br />CSLY-8 <br />CSLY-7 <br />CSLY-8 <br />CSLY-9 <br />CSLY-10 <br />CSLY-11 <br />CSLY-12 <br />CSLY-13 <br />CSLY-14 <br />CSLY-15 <br />CSLY-17 <br />CSLY-18 <br />CSLY-19 <br />CSLY-20 <br />CSLY-21 <br />CSLY-22 <br />CSLY-23 <br />CSLY-24 <br />CSLY-28 <br />CSLY-29 <br />Shaft 3 exhaus t fen (MR-337) <br /> Superstructure 120 20 10 <br /> Floor 130 31 <br /> Footings 2 3 <br />Vent Shaft 1 Compressor Building (MR-339) <br />QUANTITY UNIT CIRCES DEMO. MENU SELECTION <br />If in <br />8 96 SF Demo.disp exc. pit, 8" th. - 200 ft. <br />2 EA Trensfonnerremoval <br />40 40 LF Fencing, chain link-8 to 10 ft, high <br />1 EA Exc/load non-leaking-9K-12Kgal. <br />1 EA Exc/load non-leaking-9K-12Kgal. <br />1 EA Exc/load non-leaking-9K- 12Kgal. <br />1 EA Exc/load non-leaking-9K-12Kgal. <br />4,800 CF Demo/disp./ex, pit- 10K' haul <br />6,600 CF Demo/disiodexc. pit -10K' haul <br />7,200 CF Demo/disp./exc. pit- 10K' haul <br />39 CY Slab on grade, demo. only, rod reinforc. <br />Page 2 of 3 <br />UNIT COST TOTAL COST % LIAB. TOTAL <br />$2.68 $25814 100% $258.24 <br />$1,500.00 $3,000.00 100% $3,000.00 <br />$2.25 $85.20 100% $85.20 <br />$1,005.00 $945.00 100% $945.00 <br />$1,005.00 $945.00 100% $945.00 <br />$1,005.00 $261.00 100% $261.00 <br />$1,005.00 $875.00 100% $875.00 <br />$0.22 $864.00 100% $864.00 <br />$0.22 $1,188.00 100% $1,188.00 <br />$0.22 $1,569.60 100% $1,569.60 <br />$80.82 $3,151.98 100% $3,151.98 <br />2610 2,610 LF Pipe, se-ft.ter- 12 in. diem. $5.70 $14,877.00 100% $14,877.00 <br /> 12 2,610 CY Load/5 mi. haul, slvg - Steel fr. $7.25 $18,922.50 100% $18,922.50 <br /> 4,980 LF Pipe, sewerhvater- 12 in. diem. $5.70 $28,386.00 100% $28,386.00 <br />4980 12 4,980 CY Load/5 mi. haul, slvg - Masonry $7.60 $37,848.00 100% $37,848.00 <br /> 37 CY Load/5 mi. haul, slvg - Steel fr. $7.87 $291.19 100% $291.19 <br /> 95 LF Fencing, barbed wire - 5 strand $1.64 $155.80 100% $155.80 <br />95 <br /> 16 LF Fencing, chain link -to 6 ft. high $1.92 $30.72 100% $30.72 <br />16 <br /> 12 125 SF Demo.disp axis. pit, 12" the 10,000 ft. $4.35 $542.14 100% 5542.14 <br /> 12 125 SF Demo.disp axis. pit, 12" the 10,000 ft. $4.35 $542.14 100% $542.14 <br /> 4,518 LF Fencing, barbed wire-5 strand $1.64 $7,409.52 100% $7,409.52 <br />4518 7,510 CF Demo/disp./exc, pit - 10K' haul $0.22 $1,637.18 100% $1,637.18 <br />20 20 SY Concr, pave., demo., to 6" th., rod reinf. $10.53 $210.60 100% $210.60 <br /> 300 LF Pipe, RCP-48 in. diem. $15.48 $4,644.00 100% $4,644.00 <br />300 2,130 LF Pipe, RCP-60 in. diem. $17.22 $36,678.60 100% $36,678.60 <br />2130 60 LF Pipe, CMP-12 in. diam. $2.17 $130.20 100% $130.20 <br />60 <br /> 40 LF Pipe, CMP - 18 in. diam. $2.35 $94.00 100% $94.00 <br />40 <br /> 50 LF Pipe, CMP -72 in. diem. $25.69 $1,284.50 100% $1,284.50 <br />50 50 LF Pipe, CMP -48 in. diem. $6.19 $309.50 100% $309.50 <br />50 50 LF Pipe, CMP - 30 in. diem. $4.42 $221.00 100% $221.00 <br />50 50 LF Pipe, CMP-30 in. diem. $4.42 $221.00 100% $221.00 <br />50 50 LF Pipe, CMP-30 in. diem. $4.42 $221.00 100% $221.00 <br />50 60 LF Pipe, CMP-30 in. diem. $4.42 $265.20 100% $265.20 <br />60 60 LF Pipe, CMP-24 in. diem. $3.15 $189.00 100% $189.00 <br />60 80 LF Pipe, CMP -24 in. diem. $3.15 $252.00 100% $252.00 <br />80 90 LF Pipe, CMP - 30 in. diem. $4.42 $397.80 100% $397.80 <br />90 90 LF Pipe, RCP -84 in. diem. $50.77 $4,569.30 100% $4,569.30 <br />90 60 LF Pipe, CMP-24 in. diam. $3.15 $189.00 100% $189.00 <br />60 60 LF Pipe, CMP-24 in. diam. $3.15 $189.00 100% $189.00 <br />60 60 LF Pipe, CMP- 18 in. diam. $2.35 $141.00 100% $141.00 <br />60 50 LF Pipe, CMP -30 in, diem. $4.42 $221.00 100% $221.00 <br />50 120 LF Pipe, RCP .84 in. clam. $50.77 $6,092.40 100% $6,092.40 <br />120 60 LF Pipe, CMP -30 in. diam. $4.42 $265.20 100% $265.20 <br />60 240 LF Pipe, CMP-84 in. diam. $28.02 $6,724.80 100% $6,724.80 <br />240 270 LF Pipe, CMP-30 in. diam. $4.42 $1,193.40 100% $1,193.40 <br />270 60 LF Pipe, CMP-84 in. diem. $28.02 $1,681,20 100% $1,681.20 <br />60 40 LF Pipe, CMP-24 in. diem. $3.15 $126.00 100% $126.00 <br />40 60 LF Pipe, CMP -30 in. diem. $4.42 $26510 100% $265.20 <br />60 50 LF Pipe, CMP - 30 in, diam. $4.42 $221.00 100% $221.00 <br />50 70 LF Pipe, CMP - 18 in. diam. $2.35 $164.50 100% $164.50 <br />70 45 LF Pipe, CMP - 18 in. diem. $2.35 $105.75 100% $105.75 <br />45 60 LF Pipe, CMP - 18 in. diam. $2.35 $141.00 100% $141.00 <br />60 <br />Superstructure 30 45.1 14 <br />Concrete floor 64.5 <br />Remove compressors cycle <br />Remove 1400' of 8'-diamelre HOPE in So. G. extension rd. <br />Load and haul 1400' of 6"-diameter HDPE f/ Syl. G. extension rd. 1400 <br />Dispose HOPE f/Syl. G. extension rd. <br />Remove 280' of 6"-diameter ductile steel pipe (N2 at #2 Shaft, MR-349) <br />Load/haul 280' of 6'-diameter ductile steel pipe (N2 at #2 Shaft, MR-349) 280 <br />Dispose 280' of 6"-diameter ductile steel pipe (142 at #2 Shaft, MR-349) 280 <br />24,000 CF Demo/disp./exc. pit - 10K' haul $0.22 $5,232.00 100% $5,232.00 <br />8 4,030 SF Demo.disp exc. pit, 8" th. - 200 ft. $2.68 $10,800.40 100% $10,800.40 <br />280 LF Demo/disp./exc. pit, 2'X3'-200 ft. $24.08 $6,742.40 100% $6,742.40 <br />18,950 CF Demo/disp./exc. pit-10K'haul $0.22 $4,131.19 100% 54,131.19 <br />65 SF Demo.disp a=. pit, 12" lh. - 200 ft. 54.01 $258.65 100% $258.65 <br />2 EACH $500.00 $1,000.00 100% $1,000.00 <br />1,400 LF Pipe, CMP- 8 in. diam. $1.62 $2,268.00 100% $2,268.00 <br />92 CY Loading and 2 mile haul, no salvage - Hand loading $30.70 $2,824.40 100% $2,824.40 <br />92 CY Dump fees- Building construction materials. $90.00 $8,280.00 100% $8,280.00 <br />280 LF Pipe, CMP - 8 in. diam. $1.62 $453.60 100% $453.60 <br />16 CY Loading and 2 mile haul, no salvage - Machine loading $13.35 $217.45 100% $217.45 <br />16 CY Dump fees- Building construction materials. $90.00 $1,465.99 100% $1,465.99 <br />Total for this page before location adjustment $469,798.87 $234,867.43 <br />Location adjustment: 92.32% Total for this page after location adjustment $433,718.32 $216,829.62