My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (61)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (61)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 1:36:39 PM
Creation date
9/25/2009 1:39:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
9/16/2009
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DP-1 Riser DP-1 Emergency Spillway <br /> Pond PP-1 contained water, although no discharge was noted. PP-1 is a concrete pond and <br /> appeared to be stable with no problems noted at the time of the inspection. <br /> Pond PP-2 contained water with no discharge noted. Embankments were stable and well vegetated <br /> with no problems noted. <br /> The fresh water lagoon contained water, although not discharging at the time of the inspection. The <br /> lagoon was stable with no problems noted at the time of the inspection. <br /> Pond RP-1 was dry at the time of the inspection. Embankments were stable and well vegetated at <br /> the time of the inspection. The primary and emergency spillways were in compliance with no <br /> problems noted. <br /> Pond RP-2/3 contained a small amount of water in the upper cells with the lower cell dry at the time of <br /> the inspection. No discharge was noted. The embankments were stable and well vegetated at the <br /> time of the inspection. <br /> Pond RP-4 contained a small pool of water with no discharge at the time of the inspection. The pond <br /> embankments were stable. No problems were noted with the spillways at the time of the inspection. <br /> Pond RP-5a contained a small pool of water with no discharge noted. The combination <br /> primary/emergency spillway found to be incompliance with no problems noted. The embankments <br /> were well vegetated and stable. <br /> Pond RR-1 was dry at the time of the inspection. Embankments were stable with no problems noted. <br /> Primary riser and emergency spillway found to be in compliance. <br /> Pond SS-1 was dry at the time of the inspection. Embankments appeared stable and well vegetated <br /> with no signs of damage. <br /> Pond SS-2 was dry at the time of the inspection. No problems were noted. Embankments appeared <br /> stable with good vegetation throughout. <br /> Roadside ditches appeared to be in compliance with no problems noted. Diversion ditches around <br /> RP-1, 2/3/4, and 5A were in compliance with no damage or maintenance issues noted. Facilities area <br /> ditches appeared to be in compliance and no problems were noted with the exception of the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.