My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1982056 (60)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
_INSPECTION - C1982056 (60)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2020 10:18:54 AM
Creation date
9/25/2009 1:37:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
9/15/2009
Email Name
JHB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III.COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during <br /> the inspection. Comments also describe any enforcement actions taken during the inspection and the <br /> facts or evidence supporting the enforcement action need cleaning. <br /> Proeessine Waste: The ditch RDA-1 Bon the north side of the RDA has been cleaned. The ditch has <br /> been reshaped and rock check dams re-set.. but do not appear to have been keyed into the ditch side <br /> slopes. RDA-I B appears to have a bottom width of approximately 311. with a depth of 2 feet. Please <br /> assure that RDA-1 B is configured in accordance with the design found in Exhibit 26A Appendix D. <br /> The haul road on the RDA is well graded, side ditches shaped and runoff off the pile is directed to and <br /> staying in the appropriate ditches. The 4 18" dia. Culverts in ditch RDA-2 under the RDA haul road <br /> need cleaning. the culvert under the Clean Coal Pile access road needs clean out. TCC has submitted <br /> TR67 for a large expansion of the existing refuse pile. This revision continues to be under review. I CC <br /> continues to place coal waste on the RDA. End dump piles are drying on the surface of the pile. One <br /> haul truck was hauling coal waste at the time of the inspection. <br /> RDA-1 B: Cleaned out and reshaped <br /> Rcveeetation: TCC conducts regular weed control throughout the mine. Canada thistle (< 'h mun <br /> a)ven.se) has greened back up since earlier weed control measures. Patches identified during the <br /> inspection that need fall spraying include the north side of the RDA, along ditch RDA-1 B. and around <br /> Sediment Pond 6MN. TCC will need to seed some areas this fall. Waterline installation. 6MN outslope, <br /> Thickener undertlow line at the Brown Palace. and 181-T topsoil stockpile are the noted areas that will <br /> need seeding. <br /> 4 of WHITE-File YELLOW-Operator PINK-Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.