Laserfiche WebLink
BOREHOLE SEALING WORK <br />Taskk: TR-66a <br />Mine: Deserado Mine <br />Permit no.: C-80-007 <br />Permitting action: TR-66 <br />Date: 3/24/08 <br />User: TAK <br /> Cwt of bulk cement Water <br /> <br />(assuming 94 Ibs of <br />Total rig 2,600 gal <br />truck w/ Oeloplug Cut surface <br />Hole Plug Plug <br />Cement cost <br />cameot <br />er 1 <br />18 cf of Cement Ri <br />t <br />ti <br />Ri <br />ti <br />t <br />ti Rig w/ crew T <br />t <br />l <br />i water truck d <br />t <br />i (Circes, casing & <br />Hole diam. length p <br />. <br />volume <br />per cwt g se <br />up <br />me <br />g <br />me <br />o <br />me o <br />a <br />g <br />r <br />hourly rate w/driver ver cos <br />r $18.67 mark Total cost <br /> <br />(in) (ft) hole, that is 100 Ibs <br />(CIRCES) <br />Icfl total cost per hole (hr) fill hole (setup + cost <br />(CIRCES) <br />Koury rata (rig fill <br />Perin. <br />(CIRCES, <br /> of cement fills 1.26 fll) (Circes) time x diam.) 510.90/If) <br /> of) truck rate) <br />LWB10-1 8.75 10 4.2 3.3 $8.78 $29 0.42 <br />LWB10-2 8.75 10 4.2 3.3 $8.78 $29 0.42 <br />LWB10-3 8.75 10 4.2 3.3 $8.78 $29 0.42 <br />LWB10-4 8.75 10 4.2 3.3 $8.78 $29 0.42 <br />0.50 0.92 $227.07 $209 $60 <br />0.50 0.92 $227.07 $209 $60 <br />0.50 0.92 $227.07 $209 $60 <br />0.50 0.92 $227.07 $209 $60 <br />$30 $171 $25 $524 <br />$30 $171 $25 $524 <br />$30 $171 $25 $524 <br />$30 $171 $25 $524 <br />Totals $117 <br />$836 $1,080 $120 $1,463 $100 $2,098 <br />Total hours 3.68 <br />divided by number of rigs 1 <br />Net total hours 3.68