Laserfiche WebLink
ti <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />...:....................................................................... <br />PROJECT IDENTIFICATION <br />Task #: eee State : Colorado Permit/job # : C-1981-018 <br />Date <br />User <br />0312412008 <br />TAK <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />MATERIAL QUANTITIES <br />County: Rio Blanco <br />Site : Deserado Mine <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 0.70 acres Rip depth (ft) : 1.00 Volume : 1,129 BCY or CCY <br /> <br />Source of estimated quantity :MR-133 submittal <br />Source of estimated load factor :NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,436.70 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 5,800 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shif1day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.891 acres/hour Adjusted unit production : 1,192.46 cu. yds./hour <br />Unadjusted production : 1,436.70 cu. yds./hour Adjusted fleet production : 4,769.83 cu. yds./hour <br /> <br /> <br />JOB TIME AND COST :::::::::.:::.::::::::::::: ::::.............................................................. ..................... <br />Fleet size : 4 dozer(s) Total job time : 0.24 hours <br />Unit cost : $0.174 per cu. yd. Total job cost : $196 <br /> <br />Abbreviation :none <br />Filename : C018-eee