My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-24_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-03-24_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:01 PM
Creation date
9/17/2009 1:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
3/24/2008
Doc Name
Reclamation Cost Summary
From
DRMS
To
File
Type & Sequence
TR66
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Colorado Division of Reclamation, Mining and Safety <br />7 <br />Reclamation Cost Summary <br />Permit No. C-81-018 Prepared by: TK <br />Mine name: Deserado Permit or job action: TR-66 <br />TASK LIST (DIRECT COSTS) <br />Task no. Task description <br />ggg Revegetate 4 degas wellpads Page 1 of 1 <br />TR-66a Borehole sealing <br />eee Rip 4 degas wellpads <br />fff Replace topsoil on 4 degas wellpads? <br />ggg Regrade 4 degas wellpads J" <br />File name: cost summary.xis <br />Date: 3/24/2008 <br />County: Rio Blanco <br />Form Fleet Task Direct Cost <br />Used Size Hours <br />As 1 3.68 $ 2,098 <br />ripper 1 0.24 $ 196 <br />dozer 1 0.39 $ 320 <br />dozer 1 0.39 $ 320 <br />reveg 1 1.40 $ 415 <br />GRAND TOTAL - DIRECT COSTS 6.10 $ 3,349 <br />Indirect Costs <br />Contractor's overhead & profit <br />Liability insurance: 2.02% % of direct costs total = $ 68 <br />Performance bond: 1.05% % of direct costs total = $ 35 <br />Job superintendent: 3.05 hrs. at $ 39.38 per hour total = $ 120 <br />Profit: 10.00% % of direct costs total = $ 335 <br /> TOTAL O & P= $ 558 <br /> CONTRACT AMOUNT (direct + O & P)= $ 3,907 <br />DMG project management <br />Financial warranty processing (legal/related costs): NA <br />Engineering work and/or bid preparation: 4.25% % of contract <br />Reclamation management and/or administration: 3.25% % of contract <br />Contingency NA % of direct costs <br />Total indirect reclamation costs <br />Total performance bond amount (direct costs plus indirect costs) <br />$ 166 <br />$ 127 <br />$ 851 <br />$ 4,200
The URL can be used to link to this page
Your browser does not support the video tag.