My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $84.86 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $32.78 NA. <br />Total unit cost/hour : $256.13 Total fleet cost/hour : $512.26 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,616 CCY factor : 1.125 volume : 13,068 LCY <br />Source of estimated volume : Table TR94-1 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 500 feet <br />Unadjusted hourly production :--410.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Dry packed <br />3.00 % (ne, <br />7,000 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Job Condition Correction Factors Source <br />Operator skill : 0.85 (user) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/day) <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.07 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.68 <br />Adjusted unit production : 279.50 LCY/hr <br />Adjusted fleet production : 558.99 LCY/hr <br />Fleet size : 2 Dozer(s) Total job time : 23.38 Hours <br />Unit cost : $0.916 /LCY Total job cost : $11,975 <br />
The URL can be used to link to this page
Your browser does not support the video tag.