My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Topsoil West Horse pond <br />.. ....:...:.....:...:.:::....;:: <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $84.86 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $256.13 Total fleet cost/hour : $256.13 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 2,420 CCY factor : 1.125 volume : 2,722 LCY <br /> <br />Source of estimated volume : Table TR94-1 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production :---446.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient:- 3.00 % (i <br />Average site altitude : 7,800 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Operator skill : 0.85 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 1.00 <br />Push gradient : 1.07 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.68 <br />Adjusted unit production <br />_1I Adjusted fleet production : <br />Total job time <br />Source <br />(user) <br />(Cat HB, <br />(gen.) <br />(avg.) <br />(1 shift/da? <br />(doz-oc) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />643.63 LCY/hr <br />643.63 LCY/hr <br /> <br />4.23 Hours <br />Unit cost : $0.398 /LCY Total job cost : -$1,083
The URL can be used to link to this page
Your browser does not support the video tag.