My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basic machine : Cat D 10R - 10SU (2005) Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $84.86 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $256.13 Total fleet cost/hour : $256.13 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 807 CCY factor : 1.125 volume : 908 LCY <br />Source of estimated volume : Table TR94-1 <br />Source of estimated swell factor : cat <br />HOURLY PRODUCTION <br />Job Condition Correction Factors - <br />Source <br /> Operator skill : 0.85 (user) <br />Average push distance : 400 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 497.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 1 <br />00 (doz-o <br /> . c) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 lbs/LCY Net correction : 0.67 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 330 <br />98 LCY/h <br /> . r <br /> Adjusted fleet production : 330.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 2.74 Hours <br />Unit cost : $0.774 /LCY Total job cost : $702 <br />
The URL can be used to link to this page
Your browser does not support the video tag.